Stormwater management infrastructure for commercial sites: catch basins, detention ponds, bioretention, conveyance.
Storm drainage in Cicero is arguably the most critical infrastructure specialty in town because the combination of near-flat topography, high groundwater, and proximity to the Cicero Swamp regulated wetland makes water management an engineering-intensive discipline. Commercial projects along Route 11 and Route 31 routinely require stormwater management infrastructure disproportionate to project size — detention basins, infiltration practices where soils permit, engineered treatment swales, and significant piped conveyance networks to move runoff toward permitted outfalls. Backwell installs storm drainage systems in Cicero including reinforced concrete pipe, HDPE pipe, catch basins, manholes, headwalls, and engineered outlet structures sized per SWPPP-required calculations. We handle the full scope from mass excavation of detention ponds through piping installation, riprap energy dissipation, and vegetative stabilization.
Catch basins, storm sewer conveyance, detention and retention ponds, bioretention, permeable pavement, and stormwater management infrastructure. SWPPP and MS4 compliance.
Cicero's soils are among the most challenging in Onondaga County, defined by its position as the outlet zone for Oneida Lake and the southern edge of the Cicero Swamp Wildlife Management Area. The water table sits extraordinarily high across most of the town, often within two to four feet of grade, and in areas like Bridgeport and the Route 31 corridor it can rise to within inches during spring thaw. Beneath the organic muck and peat layers closer to the swamp lies heavy, dense glacial till with significant clay content, creating a perched water condition that traps moisture above impermeable lenses. Excavations in Cicero routinely encounter running sand, hydrostatic pressure, and unstable trench walls, making well-pointing, sheet piling, and engineered shoring standard rather than exceptional requirements on commercial sites.
The Town of Cicero enforces a layered regulatory framework shaped by its proximity to sensitive environmental resources and Oneida Lake's navigable waters. The Cicero Swamp Wildlife Management Area, a state-designated freshwater wetland complex, triggers NYSDEC Article 24 permitting for any disturbance within the regulated 100-foot adjacent area. Work along Oneida Lake's shoreline or within its tributary stream network requires coordination with the Oneida Lake Canal Corporation and NYSDEC Division of Water. Commercial projects along Routes 11, 31, and 298 also require NYSDOT highway work permits, and Micron-adjacent developments increasingly trigger expedited environmental review protocols.
Backwell serves commercial and municipal clients throughout Cicero, including:
Commercial minimum $20,000. We run our own fleet — excavators, dozers, tri-axle dump trucks, compaction equipment — and self-haul all material. No third-party trucking markup, no schedule surprises. 5.0 stars across 25 Google reviews from contractors, developers, and municipal clients across Central New York.
For broader commercial site work in the region, see our guide on commercial site work costs in Central New York.
Call (315) 400-2654 for project estimates, or send site plans for review. We typically respond within 24 hours on commercial inquiries.
Related services: Excavation · Demolition · Site Preparation · Grading · Underground Utilities · Reviews