HomeServices › Storm Drainage Contractor
Call or text:(315) 400-2654Free estimates • Ron responds personally

Storm Drainage Contractor in Manlius, NY

Stormwater management infrastructure for commercial sites: catch basins, detention ponds, bioretention, conveyance.

Storm drainage design and installation in Manlius is constrained by the Town's zero-net-runoff ordinance, making every project an exercise in creative stormwater management. The Town Engineering Department requires all commercial developments to match post-construction runoff rates to pre-development conditions for the 1-year, 10-year, and 100-year storm events. Backwell installs storm drainage systems throughout the Town including reinforced concrete pipe mainlines, HDPE and PVC laterals, precast concrete structures, and engineered infiltration practices.

Storm Drainage Services in Manlius

Catch basins, storm sewer conveyance, detention and retention ponds, bioretention, permeable pavement, and stormwater management infrastructure. SWPPP and MS4 compliance.

Why Manlius Requires Local Knowledge

Manlius sits directly atop the bedrock formation that bears its name — the Manlius Limestone, a Devonian-age carbonate unit roughly 400 million years old that outcrops throughout the Town and gave geologists their type locality here. This karst limestone creates significant excavation challenges: solution cavities, bedrock pinnacles within inches of the surface, and active sinkhole zones particularly along the Limestone Creek corridor and near the Green Lakes meromictic basins. Any commercial excavation deeper than 4 feet in Manlius should assume rock hammering, controlled blasting evaluations, and sinkhole risk assessments as baseline requirements.

Permits & Local Coordination

The Town of Manlius maintains some of the most stringent development regulations in Onondaga County, reflecting decades of effort to preserve its suburban character and protect Limestone Creek watershed. Commercial site plan review runs through both the Planning Board and Environmental Management Council, with typical engineering review timelines of 3 to 5 months before any excavation permit issues. Stormwater management plans must demonstrate zero net runoff increase and address karst sinkhole recharge concerns.

Manlius Service Areas

Backwell serves commercial and municipal clients throughout Manlius, including:

Why Backwell for Storm Drainage in Manlius

Commercial minimum $20,000. We run our own fleet — excavators, dozers, tri-axle dump trucks, compaction equipment — and self-haul all material. No third-party trucking markup, no schedule surprises. 5.0 stars across 25 Google reviews from contractors, developers, and municipal clients across Central New York.

For broader commercial site work in the region, see our guide on commercial site work costs in Central New York.

Get an Estimate for Storm Drainage in Manlius

Call (315) 400-2654 for project estimates, or send site plans for review. We typically respond within 24 hours on commercial inquiries.

Related services: Excavation · Demolition · Site Preparation · Grading · Underground Utilities · Reviews

Free Estimate

Tell us about your project.

Email Us