NYS DOL-licensed asbestos removal across Boonville, NY and Oneida County. Pre-demolition surveys, friable insulation, floor tile, siding, vermiculite. Self-performed — not subbed.
Boonville, NY's pre-1980 building stock — homes, schools, commercial structures, agricultural buildings — almost universally contains asbestos-containing materials (ACM). Backwell holds the NYS Department of Labor Asbestos Handler Contractor license and self-performs abatement in-house, including the survey coordination, ICR 56 filings, NESHAP notification, containment, removal, decontamination, and third-party air clearance.
Call (315) 400-2654 for a free written estimate.
Boonville lies on the northern edge of Oneida County at the foot of the Tug Hill plateau, where elevation climbs quickly toward one of the snowiest belts in the Northeast. The dominant soils here are Lordstown channery silt loam and Worth channery silt loam over fractured sandstone and siltstone, with organic Greenwood mucky peat in the bog and wetland depressions common across the plateau edge.
Terrain and hydrology complicate every site. The Black River flows just north of the village, the Lansing Kill cuts through the landscape to the south, and the abandoned Black River Canal corridor still defines much of the low-relief land the village was built on. Commercial site work in Boonville frequently runs into shallow bedrock on rising ground, seasonally perched water tables in the channery soils, and the outsized stormwater volumes that come with 200-plus inches of annual snowfall. Frost depth runs deeper than in the lowlands, pushing foundation, utility, and culvert design accordingly. Projects within the Black River watershed require NYSDEC stream-protection review in addition to municipal permitting, and aggregate-rich native fill is scarce enough that most structural fill has to be imported.
That building inventory — typical of Oneida County — is dominated by pre-1980 housing and commercial stock with significant ACM presence. Backwell's abatement crews handle this market every month.
Any disturbance, demolition, or renovation of a building constructed before 1980 in New York State requires an asbestos survey by a NYSDOL-licensed inspector before work begins. Backwell coordinates the survey and abatement under one contract. The 10-business-day NYSDOL notification period must run before regulated work starts.
Federal NESHAP rules (40 CFR 61 Subpart M) require EPA notification 10 working days before any regulated asbestos demolition or renovation. Backwell handles this filing.
NYSDEC Part 360 governs asbestos waste handling. Material must go to a NYSDEC-permitted asbestos-receiving landfill — Backwell uses approved transporters and provides waste manifests.
Most contractors sub asbestos work to a separate firm. Backwell holds the asbestos handler contractor license in-house. One contract, one crew, faster turnaround.
We arrange the licensed inspector for ICR 56 surveys, manage bulk sample turnaround, and file all notifications.
Backwell self-performs both. Schedule abatement Monday, demolition Wednesday — no contractor handoff delay.
General liability, asbestos-specific pollution coverage, workers' comp, umbrella. Certificates on request.
Residential typically runs $2,500 – $15,000 depending on materials and scope. Pre-demolition full-house: $5,000 – $30,000. Commercial varies by project.
Yes, if the building was built before 1980. NYS Industrial Code Rule 56 requires a licensed inspector survey before any disturbance.
Residential: 2–5 days on site after the 10-business-day NYSDOL notification period.
Yes. Backwell self-performs both. Combined contract, no handoff delay.
We use NYSDEC-permitted transporters and asbestos-receiving landfills. Waste manifests provided.
Yes. Boonville, NY and the surrounding Oneida County service area.
Get a free estimate: Call (315) 400-2654.