NYS DOL-licensed asbestos removal across Hamilton, NY and Madison County. Pre-demolition surveys, friable insulation, floor tile, siding, vermiculite. Self-performed — not subbed.
Hamilton, NY's pre-1980 building stock — homes, schools, commercial structures, agricultural buildings — almost universally contains asbestos-containing materials (ACM). Backwell holds the NYS Department of Labor Asbestos Handler Contractor license and self-performs abatement in-house, including the survey coordination, ICR 56 filings, NESHAP notification, containment, removal, decontamination, and third-party air clearance.
Call (315) 400-2654 for a free written estimate.
Hamilton occupies the upper Chenango River valley in southern Madison County, on the Appalachian Plateau's northern margin. Soils across the village and surrounding commercial parcels are dominated by Lordstown and Mardin channery silt loams on the rolling uplands, transitioning to Chenango gravelly loam and Howard gravelly loam on the outwash terraces along the river, and Wayland silt loam in the floodplain itself.
The Chenango River and its tributaries drain south toward the Susquehanna, giving Hamilton a watershed profile more typical of the Southern Tier than of Central New York. Commercial site work in Hamilton often runs into shallow sandstone and siltstone bedrock on the hillsides above the village and around Colgate University, fragipan-restricted drainage on the channery silt loam uplands, and floodplain management along the Chenango corridor. Frost depth is deeper than in the lake-influenced counties to the north, pushing utility and foundation details accordingly. Projects near the river fall under both NYSDEC stream protection and municipal floodplain review. Projects on the Colgate campus and along Route 12B routinely require subsurface investigation to confirm rock and fragipan depth before finalizing grading plans.
That building inventory — typical of Madison County — is dominated by pre-1980 housing and commercial stock with significant ACM presence. Backwell's abatement crews handle this market every month.
Any disturbance, demolition, or renovation of a building constructed before 1980 in New York State requires an asbestos survey by a NYSDOL-licensed inspector before work begins. Backwell coordinates the survey and abatement under one contract. The 10-business-day NYSDOL notification period must run before regulated work starts.
Federal NESHAP rules (40 CFR 61 Subpart M) require EPA notification 10 working days before any regulated asbestos demolition or renovation. Backwell handles this filing.
NYSDEC Part 360 governs asbestos waste handling. Material must go to a NYSDEC-permitted asbestos-receiving landfill — Backwell uses approved transporters and provides waste manifests.
Most contractors sub asbestos work to a separate firm. Backwell holds the asbestos handler contractor license in-house. One contract, one crew, faster turnaround.
We arrange the licensed inspector for ICR 56 surveys, manage bulk sample turnaround, and file all notifications.
Backwell self-performs both. Schedule abatement Monday, demolition Wednesday — no contractor handoff delay.
General liability, asbestos-specific pollution coverage, workers' comp, umbrella. Certificates on request.
Residential typically runs $2,500 – $15,000 depending on materials and scope. Pre-demolition full-house: $5,000 – $30,000. Commercial varies by project.
Yes, if the building was built before 1980. NYS Industrial Code Rule 56 requires a licensed inspector survey before any disturbance.
Residential: 2–5 days on site after the 10-business-day NYSDOL notification period.
Yes. Backwell self-performs both. Combined contract, no handoff delay.
We use NYSDEC-permitted transporters and asbestos-receiving landfills. Waste manifests provided.
Yes. Hamilton, NY and the surrounding Madison County service area.
Get a free estimate: Call (315) 400-2654.