NYS DOL-licensed asbestos removal across Ovid, NY and Seneca County. Pre-demolition surveys, friable insulation, floor tile, siding, vermiculite. Self-performed — not subbed.
Ovid, NY's pre-1980 building stock — homes, schools, commercial structures, agricultural buildings — almost universally contains asbestos-containing materials (ACM). Backwell holds the NYS Department of Labor Asbestos Handler Contractor license and self-performs abatement in-house, including the survey coordination, ICR 56 filings, NESHAP notification, containment, removal, decontamination, and third-party air clearance.
Call (315) 400-2654 for a free written estimate.
Ovid sits on the central plateau between Seneca and Cayuga lakes in Seneca County, on the narrow ridge of terrain that divides the two Finger Lakes watersheds. Soils across the village and surrounding agricultural-to-commercial parcels are predominantly Ovid silt loam — the series named for the town — along with Honeoye silt loam on the better-drained till, Lansing silt loam on the middle slopes, and Lima silt loam on the lower ground.
Drainage falls to both sides of the ridge through short, steep tributaries feeding Seneca Lake and Cayuga Lake respectively. Commercial site work in Ovid regularly involves managing fragipan-restricted subsurface drainage across essentially all of the silt loam uplands, slope stability on the steeper western and eastern flanks of the ridge, and stormwater design that has to satisfy Finger Lakes watershed protection standards for either receiving lake. Shallow shale bedrock can appear on the highest ridge sections. Frost depth is moderate given the lake-moderated microclimate. Projects along Route 96 that climb toward Willard and toward Lodi routinely require rock excavation and slope stability engineering on the steeper ridge flanks.
That building inventory — typical of Seneca County — is dominated by pre-1980 housing and commercial stock with significant ACM presence. Backwell's abatement crews handle this market every month.
Any disturbance, demolition, or renovation of a building constructed before 1980 in New York State requires an asbestos survey by a NYSDOL-licensed inspector before work begins. Backwell coordinates the survey and abatement under one contract. The 10-business-day NYSDOL notification period must run before regulated work starts.
Federal NESHAP rules (40 CFR 61 Subpart M) require EPA notification 10 working days before any regulated asbestos demolition or renovation. Backwell handles this filing.
NYSDEC Part 360 governs asbestos waste handling. Material must go to a NYSDEC-permitted asbestos-receiving landfill — Backwell uses approved transporters and provides waste manifests.
Most contractors sub asbestos work to a separate firm. Backwell holds the asbestos handler contractor license in-house. One contract, one crew, faster turnaround.
We arrange the licensed inspector for ICR 56 surveys, manage bulk sample turnaround, and file all notifications.
Backwell self-performs both. Schedule abatement Monday, demolition Wednesday — no contractor handoff delay.
General liability, asbestos-specific pollution coverage, workers' comp, umbrella. Certificates on request.
Residential typically runs $2,500 – $15,000 depending on materials and scope. Pre-demolition full-house: $5,000 – $30,000. Commercial varies by project.
Yes, if the building was built before 1980. NYS Industrial Code Rule 56 requires a licensed inspector survey before any disturbance.
Residential: 2–5 days on site after the 10-business-day NYSDOL notification period.
Yes. Backwell self-performs both. Combined contract, no handoff delay.
We use NYSDEC-permitted transporters and asbestos-receiving landfills. Waste manifests provided.
Yes. Ovid, NY and the surrounding Seneca County service area.
Get a free estimate: Call (315) 400-2654.