NYS DOL-licensed asbestos removal across Port Byron, NY and Cayuga County. Pre-demolition surveys, friable insulation, floor tile, siding, vermiculite. Self-performed — not subbed.
Port Byron, NY's pre-1980 building stock — homes, schools, commercial structures, agricultural buildings — almost universally contains asbestos-containing materials (ACM). Backwell holds the NYS Department of Labor Asbestos Handler Contractor license and self-performs abatement in-house, including the survey coordination, ICR 56 filings, NESHAP notification, containment, removal, decontamination, and third-party air clearance.
Call (315) 400-2654 for a free written estimate.
Port Byron occupies the Owasco Outlet / Seneca River corridor in northeastern Cayuga County, on terrain shaped by the Erie Canal and the surrounding drumlin field. Soils across the village and adjacent parcels are a mix of Honeoye silt loam and Lima silt loam on the drumlin flanks, Palmyra gravelly loam on the outwash benches, and Canandaigua silty clay loam and Lyons silt loam in the low canal-side flats.
The Erie Canal, the Seneca River, and the Owasco Outlet all converge near the village, creating a complex hydrologic picture with multiple base-level controls. Commercial site work in Port Byron regularly involves structural fill on the clay-loam and silt-loam flats, cobbly trenching on the drumlin flanks, and dewatering on canal-adjacent and river-adjacent parcels. NYS Canal Corp review applies inside the canal prism. Stormwater permitting ties into the Seneca / Oswego River watershed. Shallow bedrock can appear on the higher drumlin summits but is rarely a design constraint on commercial buildable land.
That building inventory — typical of Cayuga County — is dominated by pre-1980 housing and commercial stock with significant ACM presence. Backwell's abatement crews handle this market every month.
Any disturbance, demolition, or renovation of a building constructed before 1980 in New York State requires an asbestos survey by a NYSDOL-licensed inspector before work begins. Backwell coordinates the survey and abatement under one contract. The 10-business-day NYSDOL notification period must run before regulated work starts.
Federal NESHAP rules (40 CFR 61 Subpart M) require EPA notification 10 working days before any regulated asbestos demolition or renovation. Backwell handles this filing.
NYSDEC Part 360 governs asbestos waste handling. Material must go to a NYSDEC-permitted asbestos-receiving landfill — Backwell uses approved transporters and provides waste manifests.
Most contractors sub asbestos work to a separate firm. Backwell holds the asbestos handler contractor license in-house. One contract, one crew, faster turnaround.
We arrange the licensed inspector for ICR 56 surveys, manage bulk sample turnaround, and file all notifications.
Backwell self-performs both. Schedule abatement Monday, demolition Wednesday — no contractor handoff delay.
General liability, asbestos-specific pollution coverage, workers' comp, umbrella. Certificates on request.
Residential typically runs $2,500 – $15,000 depending on materials and scope. Pre-demolition full-house: $5,000 – $30,000. Commercial varies by project.
Yes, if the building was built before 1980. NYS Industrial Code Rule 56 requires a licensed inspector survey before any disturbance.
Residential: 2–5 days on site after the 10-business-day NYSDOL notification period.
Yes. Backwell self-performs both. Combined contract, no handoff delay.
We use NYSDEC-permitted transporters and asbestos-receiving landfills. Waste manifests provided.
Yes. Port Byron, NY and the surrounding Cayuga County service area.
Get a free estimate: Call (315) 400-2654.