HomeServicesStorm Drainage › Pulaski, NY
Call or text:(315) 400-2654Free estimates • Ron responds personally

Storm Drainage Contractor in Pulaski, NY

Stormwater management systems, storm drain installation, culverts, and drainage solutions for Central New York. Serving Pulaski and all of Oswego County.

Storm Drainage Services in Pulaski

Backwell provides professional storm drainage services in Pulaski, Oswego County, and the surrounding area. Central New York gets serious precipitation, and poor drainage destroys properties. Backwell designs and installs stormwater management systems that handle the volume and protect your investment. From simple yard drainage and French drains to full storm sewer systems, culvert installations, and retention areas, we build drainage solutions that work in CNY conditions.

What We Provide in Pulaski

Why Pulaski Chooses Backwell

Based in Constantia, NY, we are local to Oswego County and know the area, the soil conditions, the regulations, and the contractors. When you hire Backwell for your storm drainage project in Pulaski, you get a crew that shows up on time with the right equipment and gets the job done. Contact us today for a free estimate.

Free Estimate

Storm Drainage in Pulaski

Email Us

Storm Drainage in Nearby Areas

Geography & Site Conditions in Pulaski, NY (Oswego County)

Pulaski sits on the Salmon River in northern Oswego County, where the river cuts through the lake-plain landscape on its way to Lake Ontario. Soils across the village and the Route 11 / I-81 commercial corridor are dominated by Arkport fine sandy loam and Colonie loamy sand on the uplands, with Palmyra gravelly loam on the river terraces and Canandaigua silty clay loam in the lower flats.

The Salmon River's watershed is one of the most active sportfishing corridors in the Northeast, and any earthwork that affects the river or its tributaries falls under NYSDEC stream-protection review in addition to standard municipal permitting. Commercial site work in Pulaski regularly involves shallow water tables on the lower parcels, non-cohesive sandy cuts that require shoring, and stormwater design that accounts for extraordinarily heavy lake-effect snow loads and spring snowmelt volumes. Bedrock is deep. Frost depth pushes utility burial and foundation details well beyond lowland Onondaga norms. Projects within the Salmon River riparian corridor require coordination with NYSDEC fisheries staff on in-stream timing windows.