CIVIL SITE WORK GC OWN FLEET AND CREWS SERVING THE UNITED STATES
CALL (315) 400-2654
Home/Utility Solar Civil/Indiana/White County/Monticello
Solar Civil PackagesMonticello, INFast Mobilization

Monticello, IN Solar Farm Civil Contractor

Complete civil packages for utility solar near Monticello, IN: clearing, mass grading, access roads, collection trenching, SWPPP, fencing, and substation civil.

SERVING UTILITY SOLAR PROJECTS NEAR MONTICELLO, IN
1
Contract Per Civil Package
40+
Company Equipment Units
PWA
Certified Payroll Ready
US
National Mobilization

Backwell contracts complete civil site work packages for utility solar EPCs building near Monticello in White County, Indiana. One contract covers clearing through final stabilization, with Backwell field leadership on site.

Working Around Monticello

County seat on the Wabash River with US 24 and US 421 through town, and river and lake crossings that control oversize routing. It is the county's main supply and lodging base and has handled wind farm component traffic for years.

Utility Solar Activity in White County

Publicly reported utility-scale solar in and around White County:

Project details come from public filings and reporting and are listed to show where the work is. Backwell is not affiliated with these projects or their developers.

Ground Conditions Around Monticello

White County sits on the Tipton Till Plain, a Wisconsin age ground moraine that is flat to gently undulating with elevations mostly 650 to 730 feet, cut by the Wabash River through Monticello where Lake Shafer and Lake Freeman are impounded behind the Norway and Oakdale dams, and by the lower Tippecanoe River. Upland soils are the dark, poorly drained prairie soils of the region, Brookston and Chalmers, both of which take their names from towns in this county, together with Drummer, Milford and Rensselaer in depressions and Fincastle, Crosby, Corwin and Odell on the slightly higher ground. Parent material is a loamy to clay loam till with silt loam surface, and natural drainage is poor enough that essentially the entire agricultural surface is systematically tiled to county regulated drains.

The dark prairie soils have a deep, high organic topsoil horizon, so strip volumes and stockpile area are larger than a standard estimate assumes and the stripped material is unsuitable for structural fill. The clay loam till subgrade below carries well dry and pumps badly wet, so mass grading and access road construction are moisture window jobs, with lime or cement modification or a geogrid and stone section on main haul routes. Frost heave and spring thaw are real schedule items. Collection trenching is straightforward in till but the spoil is sticky, will not flow back around conduit, and needs select bedding, and you will cut field tile at close spacing, often every fifty to one hundred feet, which requires mapping, temporary outlets and permanent repair to the drainage board's satisfaction. Because outfalls go to regulated drains, sediment basins and skimmer outlets are the practical erosion control, not silt fence in a wet field.

Full detail on the White County market is on the White County solar civil page.

The Civil Package We Contract

We price the package as one scope under one contract, so the EPC has a single point of responsibility for the civil critical path instead of managing separate clearing, earthwork, and utility subcontracts.

Delivery Model

Backwell superintendents, project managers, and lead operators run every site. We mobilize company equipment for the core scope and scale each project with leased production fleets, qualified regional subcontractors, and agency-placed field staff, all under Backwell supervision and a single contract.

Licensing, Stormwater, and Prevailing Wage

Contractor licensing. Indiana does not issue a statewide general contractor or commercial building contractor license. Contractor licensing and registration is handled at the city and county level, so requirements vary by jurisdiction. Larger cities including Indianapolis, Evansville, Fort Wayne, and South Bend run their own contractor licensing or registration programs, generally requiring a fee, a contractor bond, general liability coverage, and workers compensation, with some jurisdictions also requiring an exam. Many rural solar host counties have no general contractor license at all, but a civil contractor should still expect county road use and haul route agreements, road maintenance bonds, county drainage board coordination on regulated drains and tile, and local building or improvement location permits. Verify the specific city or county requirement before mobilizing rather than assuming a state credential exists.

Construction stormwater. Construction Stormwater General Permit, known as the CSGP, issued by the Indiana Department of Environmental Management, IDEM. It applies to construction activity disturbing one acre or more of total land area, and to smaller areas that are part of a larger common plan of development or sale. As of December 18, 2021 the CSGP replaced the prior program administered under 327 IAC 15-5, commonly called Rule 5. Coverage is obtained by filing a Notice of Intent, or NOI, with IDEM, supported by a stormwater pollution prevention plan. Local soil and water conservation districts and county or municipal MS4 programs typically review and inspect on IDEM's behalf, so a utility-scale solar site will usually deal with both IDEM and the county SWCD. Backwell carries the SWPPP scope, installs and maintains the controls, keeps the inspection log, and closes the permit out with final stabilization.

Prevailing wage. Indiana has no state prevailing wage law. The Indiana Common Construction Wage Act was repealed effective July 1, 2015, and the state has not replaced it, so there is no state level wage determination for public or private work. Federal Davis-Bacon prevailing wage still applies to federally funded work, and applies to utility-scale solar through the Inflation Reduction Act labor requirements: projects of 1 MW AC and larger must pay Davis-Bacon prevailing wages and meet registered apprenticeship ratios to claim the full value of the investment or production tax credit. In practice that means nearly every utility-scale solar project in Indiana is built on certified payroll with apprenticeship participation even though the state itself imposes nothing. Owners and EPCs will also often impose their own project labor agreements or workforce commitments on top of the federal requirement. For projects claiming the full ITC or PTC, Backwell produces Davis-Bacon certified payroll, pays the applicable wage determination, and supports apprenticeship labor-hour compliance.

All Indiana solar civil work or the national utility solar civil page.

How to Engage Us

Send plans, a scope of work, and the schedule through the form below or call (315) 400-2654. We review the civil package, walk the site if it is at that stage, and return a scoped proposal with a schedule of values, stated fill allowances, and unit rates for overages. A one-page capability statement is available for prequalification files.

Bid and Proposal Requests

Send us your civil package.

Plans, scope, and schedule reviewed and answered promptly.

Request a Proposal

Reply in hours, not days.

No spam. Call back today.
Call Now Request a Proposal →