CIVIL SITE WORK GC OWN FLEET AND CREWS SERVING THE UNITED STATES
CALL (315) 400-2654
Home/Utility Solar Civil/Illinois
Solar Civil PackagesIllinoisFast Mobilization

Illinois Solar Farm Civil Contractor

Complete civil packages for utility solar across Illinois: clearing, mass grading, access roads, collection trenching, SWPPP, fencing, and substation civil.

SERVING UTILITY SOLAR PROJECTS ACROSS ILLINOIS
1
Contract Per Civil Package
40+
Company Equipment Units
PWA
Certified Payroll Ready
US
National Mobilization

Backwell is a civil site work general contractor serving utility solar EPCs building in Illinois. We contract complete civil packages: clearing, mass grading, access roads, trenching and underground utilities, erosion control and SWPPP, fencing, and substation civil, all under one contract with Backwell field leadership on site.

The Illinois Utility Solar Market

Illinois is one of the largest utility-scale solar markets east of the Mississippi River and the pipeline through 2028 is larger than what is already built. As of mid 2026 the state had roughly 6,557 MW of operating solar capacity, with an additional 5,259 MW reported as planned or under construction, more than double the current utility-scale operating base. Cleanview counted 381 utility-scale solar farms in Illinois totaling 4,726 MW as of July 2026, with 124 new solar farms added during 2025 alone. The activity concentrates in two bands: the downstate Ameren corridor from Sangamon and Morgan counties south through Montgomery, Coles, Clay, Jefferson, and Saline, and a northern cluster in the ComEd collar counties including Will and McHenry where county boards have been approving projects on close votes. The Climate and Equitable Jobs Act procurement framework administered by the Illinois Power Agency, combined with a 2023 state law that standardized county siting standards for commercial wind and solar, is what keeps new applications moving through county zoning at a steady rate.

Where the Work Is in Illinois

Solar EPCs and developers usually search by the county or the nearest town to the site. These are the Illinois markets we cover:

Towns We Serve in Illinois

Hillsboro, ILLitchfield, ILCoffeen, ILNokomis, ILLincoln, ILAtlanta, ILElkhart, ILMount Pulaski, ILHuntley, ILMarengo, ILWoodstock, ILHarvard, ILSpringfield, ILAuburn, ILPawnee, ILRiverton, ILJacksonville, ILWaverly, ILMeredosia, ILFranklin, ILJoliet, ILWilmington, ILBraidwood, ILPeotone, ILMount Vernon, ILIna, ILWoodlawn, ILWaltonville, ILGreenup, ILNeoga, ILToledo, ILFlora, ILLouisville, ILClay City, ILXenia, ILMattoon, ILCharleston, ILOakland, ILCanton, ILLewistown, ILFarmington, ILHavana, ILHarrisburg, ILEldorado, ILGalatia, ILCarrier Mills, IL

The Civil Package We Contract

We price the package as one scope under one contract, so the EPC has a single point of responsibility for the civil critical path instead of managing separate clearing, earthwork, and utility subcontracts.

Delivery Model

Backwell superintendents, project managers, and lead operators run every site. We mobilize company equipment for the core scope and scale each project with leased production fleets, qualified regional subcontractors, and agency-placed field staff, all under Backwell supervision and a single contract.

Licensing, Stormwater, and Prevailing Wage

Contractor licensing. Illinois does not issue a statewide general contractor, building, or civil sitework license. There is no state license to hold for commercial earthwork, grading, access roads, or site utilities on a solar project. Licensing for general construction is handled locally, so requirements come from the municipality or county where the work sits, and some counties require only a registration or a bond for work outside city limits. A few individual trades are licensed at the state level, including roofing through the Illinois Department of Financial and Professional Regulation and plumbing through the Illinois Department of Public Health, but those do not apply to sitework scope. The registration that does matter statewide is the Illinois Department of Labor public works contractor registration, which is required to bid or perform public works subject to the Illinois Prevailing Wage Act and is paired with monthly certified payroll filing. Contractors performing work in state highway right of way also need Illinois Department of Transportation prequalification and permits.

Construction stormwater. General NPDES Permit No. ILR10, Stormwater Discharges from Construction Site Activities, issued by the Illinois Environmental Protection Agency, Bureau of Water. The current permit was finalized September 13, 2023, took effect September 22, 2023, and expires August 31, 2028. Coverage is required for any construction site disturbing one or more acres, or a site under one acre that is part of a larger common plan of development or sale, which captures essentially every utility-scale solar site. A Stormwater Pollution Prevention Plan must be developed before construction starts, and a Notice of Intent must be submitted with enough lead time for a 30 day agency review period before construction begins. NOI fees are $700 for sites disturbing less than 5 acres and $1,000 for sites disturbing 5 or more acres. Many counties and municipalities, including several in the Chicago collar region, layer their own stormwater ordinance and permit on top of ILR10. Backwell carries the SWPPP scope, installs and maintains the controls, keeps the inspection log, and closes the permit out with final stabilization.

Prevailing wage. Federal Davis-Bacon prevailing wage and apprenticeship requirements apply through the Inflation Reduction Act to projects of 1 MW AC and larger where the owner is claiming the full investment or production tax credit rate, and that flows down to civil subcontractors through the EPC contract. Illinois adds a second, independent state layer. The Illinois Prevailing Wage Act, 820 ILCS 130, sets county-by-county prevailing rates published by the Illinois Department of Labor, requires public works contractor registration, and requires monthly certified transcripts of payroll filed through the IDOL portal. The Climate and Equitable Jobs Act extended these labor standards into the private renewable market: payment of prevailing wage is required on essentially all non-residential wind and solar projects participating in state renewable energy credit programs, and utility-scale wind and solar projects are required to have a project labor agreement. In practice a bidder on Illinois utility-scale solar civil work should assume both Davis-Bacon and Illinois prevailing wage apply, that the higher of the two rates governs, and that a project labor agreement with the applicable building trades council will be a condition of award. For projects claiming the full ITC or PTC, Backwell produces Davis-Bacon certified payroll, pays the applicable wage determination, and supports apprenticeship labor-hour compliance.

Other Solar Markets We Serve

How to Engage Us

Send plans, a scope of work, and the schedule through the form below or call (315) 400-2654. We review the civil package, walk the site if it is at that stage, and return a scoped proposal with a schedule of values, stated fill allowances, and unit rates for overages. A one-page capability statement is available for prequalification files.

Bid and Proposal Requests

Send us your civil package.

Plans, scope, and schedule reviewed and answered promptly.

Request a Proposal

Reply in hours, not days.

No spam. Call back today.
Call Now Request a Proposal →