Complete civil packages for utility solar near Franklinton, LA: clearing, mass grading, access roads, collection trenching, SWPPP, fencing, and substation civil.
Backwell contracts complete civil site work packages for utility solar EPCs building near Franklinton in Washington Parish, Louisiana. One contract covers clearing through final stabilization, with Backwell field leadership on site.
Parish seat at the junction of LA 25 and LA 10, with LA 25 running south to Covington and I-12 in about 30 miles. Timber and cattle country, so local trucking capacity is log truck heavy, which suits stone and dirt hauling. Sand and gravel pits along the Bogue Chitto corridor are the nearest aggregate source.
Publicly reported utility-scale solar in and around Washington Parish:
Project details come from public filings and reporting and are listed to show where the work is. Backwell is not affiliated with these projects or their developers.
Washington is Florida Parishes upland and has more relief than any other parish in this group. The ground is dissected Citronelle Formation gravelly sand and Pliocene to Pleistocene terrace material cut by the Bogue Chitto and Pearl Rivers, with ridge and side slope grades that commonly run 5 to 20 percent and steeper on the stream bluffs. Ridge and slope soils are Ruston and Smithdale sandy loams, well drained coastal plain Paleudults and Hapludults formed in thick loamy marine and fluvial deposits, with Savannah and Ora fragipan soils on the flatter interfluves that perch water above a dense pan. Narrow floodplains along the Bogue Chitto and Pearl carry sandy alluvium and flood readily. Cover is mostly loblolly and longleaf pine plantation with hardwood in the drains.
This is a real earthwork parish, not a delta flat. Clearing and grubbing is the dominant early cost because the ground is planted pine: merchantable timber should be cruised and sold rather than mulched, and stump volume is large even though sandy soils give up stumps easily. Mass grading involves genuine cut and fill quantities that can be balanced on site, and the sandy loams handle and compact well in dry weather. The risk is erosion: Ruston and Smithdale slopes rill fast once bare, so slope drains, check dams, and sediment basins sized for erodible sandy soils plus immediate temporary seeding are non negotiable, and the Bogue Chitto is a scenic river with real water quality scrutiny. Fragipan areas perch water and go soft in winter under haul traffic. The compensating advantage is local aggregate: Citronelle sand and gravel pits in this corridor mean access roads and trench bedding can be sourced within a short haul.
Full detail on the Washington Parish market is on the Washington Parish solar civil page.
We price the package as one scope under one contract, so the EPC has a single point of responsibility for the civil critical path instead of managing separate clearing, earthwork, and utility subcontracts.
Backwell superintendents, project managers, and lead operators run every site. We mobilize company equipment for the core scope and scale each project with leased production fleets, qualified regional subcontractors, and agency-placed field staff, all under Backwell supervision and a single contract.
Contractor licensing. Yes. Louisiana requires a state commercial contractor license issued by the Louisiana State Licensing Board for Contractors (LSLBC) for commercial projects valued at $50,000 or more including labor and materials, per the LSLBC types of licenses page. LSLBC issues licenses by classification, and solar civil sitework is normally performed under the heavy construction and highway, street and bridge construction classifications, with municipal and public works construction used for publicly bid utility work. The exact classification for a given scope should be confirmed with LSLBC before bidding, because Louisiana enforces classification scope, not just the license itself. Out of state contractors qualify through the same LSLBC process and must be registered with the Louisiana Secretary of State.
Construction stormwater. Louisiana Pollutant Discharge Elimination System (LPDES) storm water general permit for construction activity, administered by the Louisiana Department of Environmental Quality (LDEQ). Utility solar sites fall under the large construction general permit, LPDES Permit No. LAR100000, which covers construction disturbing five acres or more; the small construction general permit LAR200000 covers one acre up to five acres. Coverage is obtained by filing a Notice of Intent (form CSW-G) with LDEQ before construction begins, and a Storm Water Pollution Prevention Plan must be prepared and kept current. Coverage under LAR100000 is not transferable between operators. Backwell carries the SWPPP scope, installs and maintains the controls, keeps the inspection log, and closes the permit out with final stabilization.
Prevailing wage. The governing wage requirement on Louisiana utility solar is federal, not state. Projects above 1 MW that claim the increased Inflation Reduction Act investment or production tax credit must pay Davis-Bacon prevailing wages to all laborers and mechanics of the taxpayer, contractors and subcontractors for construction, alteration or repair, and must meet the registered apprenticeship labor hour requirement. Louisiana has no state prevailing wage statute layered on top of that for private construction, so there is no state schedule to track the way there is in New York or Illinois. Certified payroll on these jobs is therefore driven by the IRA credit requirements and by the EPC's contract terms, and any federally funded or federally assisted work carries Davis-Bacon on its own footing. For projects claiming the full ITC or PTC, Backwell produces Davis-Bacon certified payroll, pays the applicable wage determination, and supports apprenticeship labor-hour compliance.
All Louisiana solar civil work or the national utility solar civil page.
Send plans, a scope of work, and the schedule through the form below or call (315) 400-2654. We review the civil package, walk the site if it is at that stage, and return a scoped proposal with a schedule of values, stated fill allowances, and unit rates for overages. A one-page capability statement is available for prequalification files.
Plans, scope, and schedule reviewed and answered promptly.
Reply in hours, not days.