Complete civil packages for utility solar near Grosse Tete, LA: clearing, mass grading, access roads, collection trenching, SWPPP, fencing, and substation civil.
Backwell contracts complete civil site work packages for utility solar EPCs building near Grosse Tete in Iberville Parish, Louisiana. One contract covers clearing through final stabilization, with Backwell field leadership on site.
Sits directly on Interstate 10 at its own interchange with LA 77 running north toward Livonia and US 190. This is the best interstate access in the parish for permitted loads and the natural staging point for anything working the western Iberville and eastern Pointe Coupee flats.
Publicly reported utility-scale solar in and around Iberville Parish:
Project details come from public filings and reporting and are listed to show where the work is. Backwell is not affiliated with these projects or their developers.
Iberville is Mississippi River alluvial plain on both banks below Baton Rouge, entirely behind federal levees and drained by pump. The high ground is natural levee ridge along the river and along Bayou Grosse Tete, Bayou Plaquemine, and Bayou Maringouin, mapped as Commerce and Mhoon silt loams and silty clay loams, somewhat poorly drained loamy alluvium with a winter water table one and a half to four feet down. Behind the ridges the land falls into backswamp Sharkey clay, and on the western side toward Spanish Lake and the Atchafalaya Basin fringe into Fausse and Barbary clays, very poorly drained and saturated below about two feet year round. Ground elevations run roughly 5 to 25 feet, with the highest ground on the levee crest and the lowest in the basin flats.
Much of the developable acreage is former sugarcane, so clearing is light and grubbing is limited to fencelines and bayou riparian strips, but the cane field quarter drain and headland ditch network has to be surveyed and either preserved or rebuilt before mass grading starts. Grading is fine tolerance flat work with no meaningful borrow on site: the levee ridge silts are the only decent fill and they are usually spoken for. Sharkey and Fausse clay subgrade will not compact wet and will not carry rubber tire traffic, so access roads mean geotextile plus imported stone, and barge delivered limestone through the river terminals is the cheapest source. Trenching runs into a high water table almost immediately, so plan well point or sump dewatering and shoring. Erosion control is turbidity and sediment control at pump station and canal outfalls rather than slope stabilization.
Full detail on the Iberville Parish market is on the Iberville Parish solar civil page.
We price the package as one scope under one contract, so the EPC has a single point of responsibility for the civil critical path instead of managing separate clearing, earthwork, and utility subcontracts.
Backwell superintendents, project managers, and lead operators run every site. We mobilize company equipment for the core scope and scale each project with leased production fleets, qualified regional subcontractors, and agency-placed field staff, all under Backwell supervision and a single contract.
Contractor licensing. Yes. Louisiana requires a state commercial contractor license issued by the Louisiana State Licensing Board for Contractors (LSLBC) for commercial projects valued at $50,000 or more including labor and materials, per the LSLBC types of licenses page. LSLBC issues licenses by classification, and solar civil sitework is normally performed under the heavy construction and highway, street and bridge construction classifications, with municipal and public works construction used for publicly bid utility work. The exact classification for a given scope should be confirmed with LSLBC before bidding, because Louisiana enforces classification scope, not just the license itself. Out of state contractors qualify through the same LSLBC process and must be registered with the Louisiana Secretary of State.
Construction stormwater. Louisiana Pollutant Discharge Elimination System (LPDES) storm water general permit for construction activity, administered by the Louisiana Department of Environmental Quality (LDEQ). Utility solar sites fall under the large construction general permit, LPDES Permit No. LAR100000, which covers construction disturbing five acres or more; the small construction general permit LAR200000 covers one acre up to five acres. Coverage is obtained by filing a Notice of Intent (form CSW-G) with LDEQ before construction begins, and a Storm Water Pollution Prevention Plan must be prepared and kept current. Coverage under LAR100000 is not transferable between operators. Backwell carries the SWPPP scope, installs and maintains the controls, keeps the inspection log, and closes the permit out with final stabilization.
Prevailing wage. The governing wage requirement on Louisiana utility solar is federal, not state. Projects above 1 MW that claim the increased Inflation Reduction Act investment or production tax credit must pay Davis-Bacon prevailing wages to all laborers and mechanics of the taxpayer, contractors and subcontractors for construction, alteration or repair, and must meet the registered apprenticeship labor hour requirement. Louisiana has no state prevailing wage statute layered on top of that for private construction, so there is no state schedule to track the way there is in New York or Illinois. Certified payroll on these jobs is therefore driven by the IRA credit requirements and by the EPC's contract terms, and any federally funded or federally assisted work carries Davis-Bacon on its own footing. For projects claiming the full ITC or PTC, Backwell produces Davis-Bacon certified payroll, pays the applicable wage determination, and supports apprenticeship labor-hour compliance.
All Louisiana solar civil work or the national utility solar civil page.
Send plans, a scope of work, and the schedule through the form below or call (315) 400-2654. We review the civil package, walk the site if it is at that stage, and return a scoped proposal with a schedule of values, stated fill allowances, and unit rates for overages. A one-page capability statement is available for prequalification files.
Plans, scope, and schedule reviewed and answered promptly.
Reply in hours, not days.