Complete civil packages for utility solar near Walls, MS: clearing, mass grading, access roads, collection trenching, SWPPP, fencing, and substation civil.
Backwell contracts complete civil site work packages for utility solar EPCs building near Walls in DeSoto County, Mississippi. One contract covers clearing through final stabilization, with Backwell field leadership on site.
Below the bluff on the Delta floor near US 61, flat alluvial farmland with Mississippi River frontage close by. Access is two-lane and the soils here are Commerce, Robinsonville and Sharkey rather than the loess found east of town.
Publicly reported utility-scale solar in and around DeSoto County:
Project details come from public filings and reporting and are listed to show where the work is. Backwell is not affiliated with these projects or their developers.
The eastern two thirds of DeSoto County are the loess-capped Bluff Hills, rolling uplands mapped mostly in Memphis, Loring, Grenada and Calloway silt loams. Memphis is the well drained series on the stronger positions, while Loring, Grenada and Calloway all carry a fragipan and run moderately well to somewhat poorly drained, holding water above the pan. West of the bluff line, around Walls, Lake Cormorant and the Robinsonville area, the land drops abruptly onto the Mississippi alluvial plain with Commerce, Robinsonville, Dundee and Sharkey soils. Drainage moves north and west through Horn Lake Creek, Nonconnah Creek and the Coldwater River.
Loess is the controlling material. It stands in near vertical faces when dry and collapses when saturated, and bare loess slope will cut a gully in one rain event, so break slope lengths with diversions and rock checks and stabilize immediately behind grading rather than at closeout. The fragipan perches water and produces soft subgrade every spring: plan access roads around undercut, geotextile and crushed stone rather than counting on chemical stabilization alone. Trench excavation is fast but the walls do not stand once wet, so shore it. Below the bluff line the Sharkey clay behaves like true Delta ground, meaning no traffic when wet and imported stone for every pad.
Full detail on the DeSoto County market is on the DeSoto County solar civil page.
We price the package as one scope under one contract, so the EPC has a single point of responsibility for the civil critical path instead of managing separate clearing, earthwork, and utility subcontracts.
Backwell superintendents, project managers, and lead operators run every site. We mobilize company equipment for the core scope and scale each project with leased production fleets, qualified regional subcontractors, and agency-placed field staff, all under Backwell supervision and a single contract.
Contractor licensing. Yes. Commercial civil sitework in Mississippi requires a Commercial Certificate of Responsibility from the Mississippi State Board of Contractors. Mississippi law makes it unlawful to contract or subcontract any portion of a public or private construction project equal to or exceeding $50,000 unless the contractor or subcontractor was duly licensed by the Board as of the date bids were submitted, so the license must be in hand before bid day, not at award. Applicants file a CPA reviewed or audited financial statement and hold the classification that matches the scope, and out of state firms must also be registered with the Mississippi Secretary of State.
Construction stormwater. Mississippi Department of Environmental Quality (MDEQ), Environmental Permits Division, issues the Large Construction Storm Water General Permit, permit number MSR10, covering construction that disturbs five or more acres. Coverage is obtained by filing a Large Construction Notice of Intent (LCNOI) at least 30 days before construction starts, with a Certificate of Good Standing from the Mississippi Secretary of State dated within the prior 12 months. The property owner and the prime contractor carry joint and several responsibility for compliance, which puts the SWPPP, inspections, and BMP maintenance squarely on the civil contractor on a solar site. Backwell carries the SWPPP scope, installs and maintains the controls, keeps the inspection log, and closes the permit out with final stabilization.
Prevailing wage. Federal Davis-Bacon prevailing wage and registered apprenticeship requirements apply through the Inflation Reduction Act to qualifying projects of 1 MW alternating current and larger when the owner claims the increased credit rate, so certified payroll and apprentice ratio tracking are standard on Mississippi utility-scale solar even on privately owned sites. Mississippi does not layer a state prevailing wage law on top of that for construction contracts, and it is a right to work state, so the wage determination that governs is the federal one written into the EPC contract. Contractors should confirm the specific wage determination and apprenticeship language in each solicitation rather than assuming none applies. For projects claiming the full ITC or PTC, Backwell produces Davis-Bacon certified payroll, pays the applicable wage determination, and supports apprenticeship labor-hour compliance.
All Mississippi solar civil work or the national utility solar civil page.
Send plans, a scope of work, and the schedule through the form below or call (315) 400-2654. We review the civil package, walk the site if it is at that stage, and return a scoped proposal with a schedule of values, stated fill allowances, and unit rates for overages. A one-page capability statement is available for prequalification files.
Plans, scope, and schedule reviewed and answered promptly.