Complete civil packages for utility solar near Kirkland, TX: clearing, mass grading, access roads, collection trenching, SWPPP, fencing, and substation civil.
Backwell contracts complete civil site work packages for utility solar EPCs building near Kirkland in Childress County, Texas. One contract covers clearing through final stabilization, with Backwell field leadership on site.
West side community on US 287 near the Hall County line, in mesquite ranch and dryland farm country where site access is by county and farm to market roads.
Childress County lies in the Rolling Plains below the Caprock, on Permian red beds of the Quartermaster and related units that include gypsum and dolomite beds, producing red soils and locally gypsiferous ground. Uplands carry Miles and Springer fine sandy loams on the smoother divides, with Vernon clay loams on red bed side slopes and shallow stony soils where the red beds and gypsum outcrop along the breaks. The county drains north and east to the Prairie Dog Town Fork of the Red River and to the Salt Fork, through Buck Creek, Groesbeck Creek and their tributaries, all flashy ephemeral channels with sandy beds and steep cut banks. Relief is moderate: broad rolling divides broken by badlands style erosion along the creeks.
Clearing is mesquite and scattered juniper with light overall volume but stubborn root systems. The sandy loams cut and shape easily and drain well, but they are highly erodible, so unprotected slopes rill fast and blowing sand becomes an immediate problem when stripped. Where gypsum and gypsiferous red bed are present, check sulfate levels before setting concrete mix designs and buried steel protection, and be aware that gypsum can dissolve and create localized soft or collapsing ground. Creek crossings on access roads should be armored low water crossings designed for flash flow, since the same channel is dry most of the year and running bank full for a few hours. Trenching production is generally good in the loams and slows in cemented red bed and caliche. Local caliche where present is worth using as base to cut import hauls.
Full detail on the Childress County market is on the Childress County solar civil page.
We price the package as one scope under one contract, so the EPC has a single point of responsibility for the civil critical path instead of managing separate clearing, earthwork, and utility subcontracts.
Backwell superintendents, project managers, and lead operators run every site. We mobilize company equipment for the core scope and scale each project with leased production fleets, qualified regional subcontractors, and agency-placed field staff, all under Backwell supervision and a single contract.
Contractor licensing. Texas does not issue a statewide general contractor or general engineering contractor license, so commercial civil sitework requires no state contractor license. Licensing in Texas is trade specific: electrical work is licensed by the Texas Department of Licensing and Regulation, plumbing by the Texas State Board of Plumbing Examiners, and sealed design work requires a Texas Professional Engineer registered with the Texas Board of Professional Engineers and Land Surveyors. Cities and counties can require their own contractor registration, bonds and permits, so registration is handled jurisdiction by jurisdiction. Out of state contractors register with the Texas Secretary of State to transact business and should confirm Texas Comptroller franchise tax standing.
Construction stormwater. Construction stormwater in Texas is permitted under the TPDES Construction General Permit, number TXR150000, issued by the Texas Commission on Environmental Quality (TCEQ). Utility-scale solar sites disturbing five acres or more are large construction activity and require a Notice of Intent, a Stormwater Pollution Prevention Plan, a posted site notice and a Notice of Termination at completion. Sites between one and five acres are small construction activity with a site notice and SWPPP. TCEQ is the delegated permitting authority in Texas, not EPA Region 6. Backwell carries the SWPPP scope, installs and maintains the controls, keeps the inspection log, and closes the permit out with final stabilization.
Prevailing wage. Federal Davis-Bacon prevailing wage and apprenticeship requirements apply through the Inflation Reduction Act to solar facilities of 1 MW AC and larger that claim the full investment or production tax credit, which covers essentially every project on this list. That means Davis-Bacon rates for the county, weekly certified payroll, and qualified apprentice labor hour percentages flowed down to subcontractors. Texas has no state prevailing wage law that reaches privately owned solar projects. Texas Government Code Chapter 2258 requires prevailing wage only on public works contracts let by the state or a political subdivision, with rates set by the awarding public body, so it does not apply to private utility-scale solar. In practice the IRA requirements are the operative wage and recordkeeping driver on Texas solar. For projects claiming the full ITC or PTC, Backwell produces Davis-Bacon certified payroll, pays the applicable wage determination, and supports apprenticeship labor-hour compliance.
All Texas solar civil work or the national utility solar civil page.
Send plans, a scope of work, and the schedule through the form below or call (315) 400-2654. We review the civil package, walk the site if it is at that stage, and return a scoped proposal with a schedule of values, stated fill allowances, and unit rates for overages. A one-page capability statement is available for prequalification files.
Plans, scope, and schedule reviewed and answered promptly.