CIVIL SITE WORK GC OWN FLEET AND CREWS SERVING THE UNITED STATES
CALL (315) 400-2654
Home/Utility Solar Civil/Wisconsin/Juneau County/Camp Douglas
Solar Civil PackagesCamp Douglas, WIFast Mobilization

Camp Douglas, WI Solar Farm Civil Contractor

Complete civil packages for utility solar near Camp Douglas, WI: clearing, mass grading, access roads, collection trenching, SWPPP, fencing, and substation civil.

SERVING UTILITY SOLAR PROJECTS NEAR CAMP DOUGLAS, WI
1
Contract Per Civil Package
40+
Company Equipment Units
PWA
Certified Payroll Ready
US
National Mobilization

Backwell contracts complete civil site work packages for utility solar EPCs building near Camp Douglas in Juneau County, Wisconsin. One contract covers clearing through final stabilization, with Backwell field leadership on site.

Working Around Camp Douglas

At the I-90 and I-94 interchange under the sandstone buttes, adjacent to Volk Field. This is where the sand plain meets rock, and the nearest quarried aggregate sources sit in this western part of the county and over into Monroe County.

Utility Solar Activity in Juneau County

Publicly reported utility-scale solar in and around Juneau County:

Project details come from public filings and reporting and are listed to show where the work is. Backwell is not affiliated with these projects or their developers.

Ground Conditions Around Camp Douglas

Juneau County straddles two very different landscapes. The eastern half is the flat floor of Glacial Lake Wisconsin, a sand plain of cranberry marshes, ditch networks, and reservoirs around Necedah and the Necedah National Wildlife Refuge, with Petenwell Flowage on the north edge. The western half is the eastern rim of the Driftless Area, with isolated Cambrian sandstone buttes and dissected uplands near Camp Douglas and Mill Bluff. Soils are Plainfield and Sparta sands on the plain with Newson and Meehan in the wet swales, peat and muck in the cranberry beds, and Boone, Gale, and Norden soils derived from sandstone and loess on the bluffs and ridges. The Lemonweir and Yellow Rivers drain the county and the water table on the lake plain is commonly within a few feet of grade.

On the lake plain the ground is already flat, so the earthwork is small and the real cost sits in access roads: clean sand will not carry loaded trucks, so geogrid or geotextile plus imported crushed stone is the working assumption. Shallow groundwater means trench dewatering on anything deeper than five or six feet, buoyancy checks on vaults and pipe, and careful sequencing after wet periods, and the cranberry ditch, dike, and reservoir network means culvert crossings and water rights conversations before a dozer moves. On the western bluffs the story flips to sandstone at shallow depth, ripping or hammering in trench, and steep loess slopes that need switchbacked access roads and aggressive slope protection.

Full detail on the Juneau County market is on the Juneau County solar civil page.

The Civil Package We Contract

We price the package as one scope under one contract, so the EPC has a single point of responsibility for the civil critical path instead of managing separate clearing, earthwork, and utility subcontracts.

Delivery Model

Backwell superintendents, project managers, and lead operators run every site. We mobilize company equipment for the core scope and scale each project with leased production fleets, qualified regional subcontractors, and agency-placed field staff, all under Backwell supervision and a single contract.

Licensing, Stormwater, and Prevailing Wage

Contractor licensing. Wisconsin does not issue a statewide general contractor or commercial building contractor license. Commercial civil sitework is not licensed at the state level: it is controlled through local building and site permits, Department of Safety and Professional Services plan review for buildings and structures, and Department of Natural Resources permits for stormwater and any wetland or waterway work. State credentials from DSPS apply to one and two family dwelling contractors, through the Dwelling Contractor Certification and the Dwelling Contractor Qualifier, and to the separately licensed trades such as electrical, plumbing, and HVAC. For a solar civil package, the practical prequalification gates are insurance, experience modification rate, bonding capacity, and EPC prequalification rather than a state contractor license number. Confirm town, village, and county requirements site by site, since some municipalities require contractor registration or road use and haul route agreements.

Construction stormwater. Wisconsin Pollutant Discharge Elimination System (WPDES) Construction Site Storm Water Runoff General Permit, storm water associated with land disturbing construction activity, General Permit No. WI-S067831-6, issued by the Wisconsin Department of Natural Resources under Chapter NR 216, Subchapter III of the Wisconsin Administrative Code. Coverage is required for most construction projects disturbing one or more acres, and the applicant submits a Notice of Intent along with an erosion control plan and a post construction storm water management plan. Backwell carries the SWPPP scope, installs and maintains the controls, keeps the inspection log, and closes the permit out with final stabilization.

Prevailing wage. Wisconsin repealed its own state prevailing wage law. The requirement was eliminated for local government public works projects effective January 1, 2017, and for state and state highway projects effective in 2017, so there is no state prevailing wage schedule applying to private utility scale solar construction in Wisconsin. Federal Davis-Bacon wage determinations still apply through the Inflation Reduction Act prevailing wage and apprenticeship requirements for projects of 1 MW alternating current and above that claim the increased investment or production tax credit, and virtually every project in this list is far above that threshold. In practice that means certified payroll, Davis-Bacon classification, and registered apprenticeship participation are contract conditions flowed down by the EPC even though no state law compels them. Project labor agreements or owner specific labor commitments can add union scale requirements on top, so confirm the labor terms in each EPC's subcontract rather than assuming the absence of a state law means open shop. For projects claiming the full ITC or PTC, Backwell produces Davis-Bacon certified payroll, pays the applicable wage determination, and supports apprenticeship labor-hour compliance.

All Wisconsin solar civil work or the national utility solar civil page.

How to Engage Us

Send plans, a scope of work, and the schedule through the form below or call (315) 400-2654. We review the civil package, walk the site if it is at that stage, and return a scoped proposal with a schedule of values, stated fill allowances, and unit rates for overages. A one-page capability statement is available for prequalification files.

Bid and Proposal Requests

Send us your civil package.

Plans, scope, and schedule reviewed and answered promptly.

Request a Proposal

Reply in hours, not days.

No spam. Call back today.
Call Now Request a Proposal →