Complete civil packages for utility solar near Plover, WI: clearing, mass grading, access roads, collection trenching, SWPPP, fencing, and substation civil.
Backwell contracts complete civil site work packages for utility solar EPCs building near Plover in Portage County, Wisconsin. One contract covers clearing through final stabilization, with Backwell field leadership on site.
Two I-39 interchanges and a large industrial and distribution park make Plover the practical laydown and staging town for Central Sands work. Sand and gravel pits are numerous, but crushed aggregate for base course still has to be trucked in from outside the sand plain.
Publicly reported utility-scale solar in and around Portage County:
Project details come from public filings and reporting and are listed to show where the work is. Backwell is not affiliated with these projects or their developers.
Portage County sits in the Central Sands: a broad pitted glacial outwash plain west and south of Stevens Point, the flat Buena Vista Marsh basin in the far south, and Wisconsin River terraces through Stevens Point and Plover, with loamier till and moraine rising in the east around Amherst and Rosholt. The dominant soils are Plainfield and Coloma loamy sands, excessively drained and droughty, with Newson and Meehan sands in the wet swales and Houghton muck in the marsh basins; the eastern uplands carry Rosholt sandy loam and loess capped silt loams. The water table sits within a few feet of grade across much of Buena Vista and the outwash, which is why the county is blanketed in center pivot irrigation and high capacity wells. Drainage runs through the Little Plover River, an engineered ditch network in Buena Vista Marsh, and the Wisconsin River.
Excavation is cheap and rock is essentially absent, but loose sand will not build or hold a haul road under loaded trucks, so plan geotextile and imported crushed stone hauled in from Marathon County granite sources rather than counting on onsite material for base. Trench walls in clean sand ravel immediately and demand boxes or laid back slopes, and the marsh fringe needs dewatering plus culvert and ditch crossings that trigger DNR review. Erosion control here is a wind and blowout problem more than a sheet flow problem: low silt content means slow vegetative catch, so tackified mulch, temporary irrigation, and fast cover matter more than another run of silt fence.
Full detail on the Portage County market is on the Portage County solar civil page.
We price the package as one scope under one contract, so the EPC has a single point of responsibility for the civil critical path instead of managing separate clearing, earthwork, and utility subcontracts.
Backwell superintendents, project managers, and lead operators run every site. We mobilize company equipment for the core scope and scale each project with leased production fleets, qualified regional subcontractors, and agency-placed field staff, all under Backwell supervision and a single contract.
Contractor licensing. Wisconsin does not issue a statewide general contractor or commercial building contractor license. Commercial civil sitework is not licensed at the state level: it is controlled through local building and site permits, Department of Safety and Professional Services plan review for buildings and structures, and Department of Natural Resources permits for stormwater and any wetland or waterway work. State credentials from DSPS apply to one and two family dwelling contractors, through the Dwelling Contractor Certification and the Dwelling Contractor Qualifier, and to the separately licensed trades such as electrical, plumbing, and HVAC. For a solar civil package, the practical prequalification gates are insurance, experience modification rate, bonding capacity, and EPC prequalification rather than a state contractor license number. Confirm town, village, and county requirements site by site, since some municipalities require contractor registration or road use and haul route agreements.
Construction stormwater. Wisconsin Pollutant Discharge Elimination System (WPDES) Construction Site Storm Water Runoff General Permit, storm water associated with land disturbing construction activity, General Permit No. WI-S067831-6, issued by the Wisconsin Department of Natural Resources under Chapter NR 216, Subchapter III of the Wisconsin Administrative Code. Coverage is required for most construction projects disturbing one or more acres, and the applicant submits a Notice of Intent along with an erosion control plan and a post construction storm water management plan. Backwell carries the SWPPP scope, installs and maintains the controls, keeps the inspection log, and closes the permit out with final stabilization.
Prevailing wage. Wisconsin repealed its own state prevailing wage law. The requirement was eliminated for local government public works projects effective January 1, 2017, and for state and state highway projects effective in 2017, so there is no state prevailing wage schedule applying to private utility scale solar construction in Wisconsin. Federal Davis-Bacon wage determinations still apply through the Inflation Reduction Act prevailing wage and apprenticeship requirements for projects of 1 MW alternating current and above that claim the increased investment or production tax credit, and virtually every project in this list is far above that threshold. In practice that means certified payroll, Davis-Bacon classification, and registered apprenticeship participation are contract conditions flowed down by the EPC even though no state law compels them. Project labor agreements or owner specific labor commitments can add union scale requirements on top, so confirm the labor terms in each EPC's subcontract rather than assuming the absence of a state law means open shop. For projects claiming the full ITC or PTC, Backwell produces Davis-Bacon certified payroll, pays the applicable wage determination, and supports apprenticeship labor-hour compliance.
All Wisconsin solar civil work or the national utility solar civil page.
Send plans, a scope of work, and the schedule through the form below or call (315) 400-2654. We review the civil package, walk the site if it is at that stage, and return a scoped proposal with a schedule of values, stated fill allowances, and unit rates for overages. A one-page capability statement is available for prequalification files.
Plans, scope, and schedule reviewed and answered promptly.
Reply in hours, not days.