PE Stamped Design Health Dept Submittal Cayuga County

Septic Engineer for Owasco, NY Lake and Upland Lots

Owasco Lake supplies public water to Auburn and the Town of Owasco. Septic design here is held to watershed rules on top of the state code. We handle the test holes, the stamped plan and the install.

Serving OWASCO · CAYUGA COUNTY · CENTRAL NEW YORK
Cayuga County Health Department plan review fee
$100
to
$150
$150 for a new system plan. $100 for a conventional trench repair, $150 for other repair types. County fee only, not the design or install.
100 ft
Field to Lake
5.0★
117 Reviews
1 hr
Written Estimate
75-A
State Design Code
What You Need to Know

Fees. Process. Answers.

What a septic plan in the Town of Owasco has to clear before the county accepts it.

$150
County review, new septic system plan
$100
County review, conventional trench repair or modification
$150
County review, other repair types (raised, mound, pressure)
$0
Resubmittal of a previously approved but expired plan
✓
Perc tests and deep hole evaluation by the design professional
✓
Septic plan prepared and stamped by a New York licensed PE
✓
Three plan sets, application and $150 review fee to the Cayuga County Health Department
✓
Owasco Lake watershed setbacks checked where they apply
✓
Coordination with the town Code Enforcement Officer for the building permit
✓
Installation to the accepted plan
✓
PE construction verification before backfill
✓
Certificate of construction letters to the county
✓
Final measurements of tank and distribution box for your file

Yes. Cayuga County's repair application says that if the system is in the Owasco Lake or Little Sodus Bay watershed, a Licensed Professional Engineer or Registered Architect must prepare the plans for the repair or modification.

Appendix 75-A requires 100 feet from an absorption field to a lake, stream or wetland. The 2023 proposed Owasco Lake watershed rules also require 100 feet from the high-water mark, measured to both the field and its expansion area.

The county posts them as an update to the 1984 rules, with state recommendations dated September 15, 2023, after the City of Auburn and the Town of Owasco supported adoption. We have not seen a final adoption notice, so we treat them as proposed and design to them anyway.

Not for a new home under Appendix 75-A, except while the system is under construction. The proposed watershed rules allow one only during construction or as a repair where nothing else fits, at least 50 feet from water, with an 80 percent full alarm.

The Cayuga County Health Department, Environmental Health Division, 8 Dill Street, Auburn, NY 13021, (315) 253-1405.

$150 for a new system plan, and $100 or $150 for a repair depending on system type, per the 2025 county applications. Design and install are separate from that fee.

Send the address and what you need through the form. Estimate in 1 hour.

The short answer for Owasco

Owasco is the town on the east side of Owasco Lake, and the lake is the drinking water source for both the City of Auburn and the Town of Owasco. Any new system, repair or replacement here needs a design professional, and repairs in the Owasco Lake watershed are on the short list where Cayuga County says a Licensed Professional Engineer or Registered Architect must prepare the plans, even for a modification.

Designs are prepared and stamped by a New York licensed Professional Engineer (PE). Backwell coordinates the design, the Cayuga County Health Department submittal, and the install.

Owasco Lake watershed rules, current and proposed

The watershed has had rules and regulations since 1984. An update was drafted by the Owasco Lake Watershed Management Council on behalf of the City of Auburn and the Town of Owasco, supported by both boards in October 2020, and sent to the NYS Department of Health for state review. Cayuga County posts the 2023 version with state recommendations dated September 15, 2023. As of this writing we have not seen a final adoption notice, so treat these as proposed. They are worth designing to now, because they show where review is heading:

  • The absorption area, including the required expansion area, at least 100 feet from the high-water mark of Owasco Lake and from all waters of the state.
  • No absorption area in a FEMA floodway, floodplain or special flood hazard area unless the bottom of the field is at least 2 feet above the flood elevation.
  • An extra 50 percent of usable area set aside for future expansion.
  • Land based holding tanks only during construction, or as a repair where nothing else fits, at least 50 feet from the lake or any water, with an alarm at 80 percent full and three years of pump-out receipts kept.
  • All new installs and all alterations, repairs and replacements, except minor repairs, designed by a design professional.
  • No new construction, addition or change of use, such as turning a garage into a bedroom, until the county has approved the septic side.
  • Lakefront owners who offer short term rentals notify the watershed inspection division by May 1 each year.

Soils on the east side of the lake

The lakeshore and the low ground behind it run to wet, fine textured soils: the county soil survey maps Canandaigua silty clay loam, poorly to very poorly drained, in low lake plain positions around Owasco Lake. Climbing east onto the till, the ground turns to Honeoye silt loam on the drumlins, well drained, and Lima silt loam, moderately well drained. That split decides most designs. Upland Honeoye lots can often carry a conventional or shallow trench. Shoreline lots with water near the surface, and narrow lake lots where the field cannot reach the 100 foot line, push toward a raised system, a mound with pressure dosing, or an enhanced treatment unit ahead of the field.

Appendix 75-A sets the limits. A raised system needs at least one foot of original soil faster than 60 minutes per inch, the high groundwater at least one foot below the surface, and slopes no steeper than 15 percent. A mound needs bedrock at least two feet down, natural soil faster than 120 minutes per inch, and slopes of 12 percent or less.

How a septic design works in Owasco

  1. Address and plans. Bedrooms, new house or replacement, and if you rent the place out. Estimate in 1 hour.
  2. Locate the lake line and every watercourse. The 100 foot distance is measured to the absorption area and the expansion area. Tributary streams count, not just the lake.
  3. Perc and deep hole. At least two perc tests and a test hole at least six feet deep. On wet ground the deep hole records the seasonal high water and the type of water table.
  4. PE stamped plan. System type picked from the soil data, with the reserve area drawn.
  5. Cayuga County review. Three copies, application and fee to 8 Dill Street, Auburn. County staff check the property and review against Appendix 75-A. The accepted plan is copied to the town Code Enforcement Officer.
  6. Install, then certify. The PE verifies the install before backfill and files the certificate of construction. Abandoned tanks are pumped and removed or filled.

Problems we see on Owasco lots

Old cottage, field too close to the water

The fix is usually moving the field uphill toward the road and pumping effluent up to it, with a pressure distribution network. Where the lot is too small for a full field, an enhanced treatment unit can cut the trench length by 33 percent under 75-A when maintenance is required by local code or watershed rules.

Wet spring yard

Water inside 12 inches of the surface rules out a raised system and a mound under 75-A. That lot may need curtain drainage first, or a holding tank as the last resort repair the proposed rules allow.

Garage turned into a bedroom

The proposed rules name this exact change. Expect a county look at tank size and field length before the town signs off.

Timeline and county paperwork

The county says approval to construct may take up to 4 to 6 weeks after a complete submittal. Before closing on any Owasco home, Cayuga County also requires the septic be inspected and the tank pumped; a transfer inspection is valid for one year and counts as the routine inspection.

Sources

Rules and fees as published by each office on the date this page was written. They can change; the design is checked against the current versions at submittal.

Excavated septic absorption trenches laid out on a residential lot
Concrete septic tank set in an excavation before backfill
Finished septic field area graded and ready for seed