SAM REGISTERED NYS DOL LICENSED SERVING SYRACUSE & CNY
CALL (315) 810-9558
Home/Septic Engineer/Fabius, NY
PE Stamped Design Perc & Deep Hole Onondaga County

Septic Engineer in Fabius, NY

Every home in Fabius is on its own septic system, and the town plan says that will not change. Testing, PE stamped designs and the county submittal.

Serving FABIUS · ONONDAGA COUNTY · CENTRAL NEW YORK
Onondaga County septic plan review fees run
$62
to
$310
County Health Department fees from the published county fee schedule. Testing, design and install are priced in writing.
$310
County Full Review
5.0★
117 Reviews
1 hr
Written Estimate
PE
Stamped Designs
What You Need to Know

Fees. Process. Answers.

Septic design for Fabius, NY, from soil test to county approval.

$310
Full application, system under 1,000 gallons per day
$186
Redesigned project
$62
Amended project or revised plan review
$93
Site investigation fee
$62
Repair inspection
✓
Perc hole and deep test pit coordination
✓
Design prepared and stamped by a NY licensed PE
✓
Scaled plan with wells, setbacks and elevations
✓
Onondaga County Health Department submittal
✓
Watershed application where the lot needs one
✓
Town building permit file
✓
Fill placement and certification coordination
✓
Install with county inspection
✓
Bedroom addition and replacement evaluations

No. The Town of Fabius Comprehensive Plan says sewage disposal throughout Fabius depends on onsite systems and is not expected to change.

Mardin soils have a dense fragipan 14 to 26 inches down, and Arnot and Lordstown soils sit on shallow bedrock. The USDA rates about 88 percent of rated land very limited for conventional fields, mostly from seasonal water and depth to rock.

The Fabius zoning law allows an existing undersized lot to be used for a permitted use only if Health Department and other permit requirements can be met. A septic feasibility test answers that.

The Onondaga County Health Department, Bureau of Public Health Engineering. The town or village code officer issues the building permit.

Designs are prepared and stamped by a New York licensed Professional Engineer (PE).

Use the form. Estimate in 1 hour.

Septic engineer in Fabius, NY: what it is and who needs one

Fabius is the southeast corner of the county, plateau country around Highland Forest and the head of Butternut Creek. The town's comprehensive plan says sewage disposal throughout Fabius depends on onsite systems and that is not expected to change. A septic engineer tests the soil, designs to Appendix 75-A, and gets approval from the Onondaga County Health Department.

Backwell coordinates testing, design, the submittal and the install. Designs are prepared and stamped by a New York licensed Professional Engineer (PE).

Onsite systems, town policy

Neither the Town nor the Village of Fabius is in the county Consolidated Sanitary District. The town plan says it is town policy to minimize septic failure by controlling development density and supporting county Health Department rules. The zoning law backs that up: multi family dwellings need 15,000 square feet per unit with Health Department approval of the septic system, any proposed water and sewage system has to be approved by the proper agencies, and an existing undersized lot can be used only if Health Department and other permit requirements can be met.

That covers the Village of Fabius at Routes 80 and 91, Apulia, Apulia Station, Gooseville Corners and Vincent Corners.

Soils in Fabius and the system they point to

Fabius has the hardest upland soils in this group. Mardin, with a dense fragipan 14 to 26 inches down, covers 14 percent of the town. Lordstown soils over siltstone and sandstone, and Arnot soils with bedrock at 10 to 20 inches, add another 16 percent. Honeoye, Lansing and Palmyra fill out the rest.

Soil seriesShare of landWhat it is (USDA)What it usually means for the design
Mardin14%very deep, moderately well drained till with a dense fragipan starting 14 to 26 inches downLess than 2 feet over the pan often means raised bed or mound.
Honeoye12%very deep, well drained loamy glacial tillOften deep enough for a conventional trench field. The perc rate and the 6 foot test pit still decide it.
Palmyra11%very deep, well drained gravelly outwash over stratified sand and gravelDrains well, sometimes too well. Soil faster than 1 minute per inch is not suitable as is under 75-A.
Lordstown8%moderately deep, well drained soil over siltstone and sandstoneRock within 20 to 40 inches. Shallow trench or raised design.
Arnot8%shallow soil with bedrock at 10 to 20 inchesToo shallow for trenches or a mound. These spots usually get skipped for the field.
Lansing7%very deep, well drained tillUsually deep enough for conventional trenches where slope allows.

USDA septic absorption field ratings, the Town of Fabius boundary: very limited 88 percent, somewhat limited 12 percent of rated land. Leading limits: shallow seasonal water, depth to bedrock, fast seepage in the bottom layer.

About 88 percent of rated land is very limited for a conventional field. Seasonal water and depth to bedrock together are more than half the reasons, with fast seepage third. The town plan names the same limits: slow permeability, shallow bedrock, wetness and steep slopes. On Mardin ground, less than 2 feet of usable soil above the pan usually means a raised bed. On Arnot ground, rock at 10 to 20 inches is too shallow for trenches or a mound, and those spots usually get skipped for the field. Palmyra gravel in the valleys percs fast, and the plan warns about poorly treated septic effluent seeping into the productive aquifers under the valley soils.

Headwaters, reservoirs and aquifers

The West Branch of the Tioughnioga River drains much of central Fabius. Butternut Creek starts just south of Apulia Station, and Limestone Creek flows out of the De Ruyter Reservoir, a small western part of which is inside the town. Fields stay 100 feet from all of them and from wetlands. Highland Forest County Park is in the southeast and the Labrador Hollow Unique Area in the southwest.

The aquifer warning in the town plan matters for design. The county guidelines say 4 feet of suitable soil to bedrock may be required where needed to protect aquifers, and Appendix 75-A treats soil faster than 1 minute per inch as unsuitable unless modified.

How a septic design in Fabius works

  1. Send the address. Use the form. Estimate in 1 hour.
  2. Confirm sewer or septic. If a public sewer can serve the lot, you do not need a septic design.
  3. Perc holes and a deep test pit. At least two staked perc holes in the design area (30 inches deep for a conventional system) and a test pit logged to 6 feet for mottling, water and rock.
  4. Stamped design. A scaled plan with the tax map number, nearby wells, elevations and system details. Designs are prepared and stamped by a New York licensed Professional Engineer (PE).
  5. County submittal. Plan and fee go to the Bureau of Public Health Engineering, 421 Montgomery Street, Syracuse: 3 plan copies outside the lake watersheds. Once approved, a copy goes to the town.
  6. Building permit. Town of Fabius Code Enforcement and Zoning, through the Town Clerk at 7786 Main Street. The Village of Fabius has its own zoning and code officer.
  7. Install and inspection. County inspection on 24 hours notice. Inside plumbing is done by a plumber licensed through Onondaga County Plumbing Control, and fill systems get the engineer's fill certification first.

What it costs

The county fee schedule sets the health department side for a lot under 1,000 gallons per day: $310 full application, $186 redesigned project, $62 amended project or revised plan review, $93 site investigation, $62 repair inspection. The fee is paid with the plans and covers the county's review and construction inspection. Testing, design and install are priced in writing.

What the health department checks

The county reviews the plan against New York's Appendix 75-A and its own design guidelines. In Fabius the checks that decide most designs are depth to the fragipan or rock in the 6 foot pit, the 2 foot separation to seasonal water, and fast valley gravel over the aquifer.

  • Flow and tank. 110 gallons per day per bedroom for new construction. Tank size follows the bedroom count.
  • Usable soil. Conventional: 4 feet over rock, clay or high water, with water 2 feet below the trench bottom. Shallow trench: 2 to 4 feet. Raised bed: 1 to 2 feet, water 1 foot down. Mound: water 1 foot down, rock 2 feet down, native perc faster than 120 minutes per inch, slope under 12 percent.
  • Separations. Field, raised bed or mound: 100 feet to wells (200 if upgrade in the drainage path), 100 feet to water and wetlands, 20 to the house, 10 to the lot line, measured from the toe of any fill. Tank: 50 feet to wells and water.
  • Site limits. No field over 15 percent slope or below the 10 year flood level, system above the 100 year flood level, no soil faster than 1 minute per inch unless modified, and 50 percent expansion area where possible.

Common Fabius problems and how the design handles them

Fragipan at 18 inches

The problem: Mardin soils put a dense pan close to the surface, and water perches on it in spring.

How the design handles it: If there is at least 1 foot of usable soil and water is 1 foot down, a raised bed on fill that percs 5 to 30 minutes per inch.

Rock at a foot

The problem: Arnot soils have bedrock at 10 to 20 inches. A mound needs 2 feet to rock and a raised bed needs at least 1 foot of usable native soil.

How the design handles it: The PE tests other parts of the lot for deeper soil before designing. Some sites have none, and it is better to know before you buy.

Valley lot over the aquifer

The problem: Fast gravel can pass effluent to groundwater without enough treatment.

How the design handles it: The design slows it down and keeps the separation the county asks for over aquifers.

Timeline

Fabius soils hide their water in summer, so spring testing or careful mottling reads matter. Raised beds add fill settling (6 months through a freeze and thaw for native fill) and the engineer's certification before the field goes in.

Sources

Soil shares and ratings come from the USDA NRCS soil survey (SSURGO) for Onondaga County, summarized for the Town of Fabius boundary. Regulations and fees as published by the agencies below; they can change.

  1. Onondaga County Health Department, Septic Systems (Bureau of Public Health Engineering)
  2. Onondaga County Environmental Health fee schedule
  3. Onondaga County Design Guidelines for Individual Sewage Systems
  4. Onondaga County Health Department Fill Certification Form
  5. NYS DOH 10 NYCRR Appendix 75-A, Wastewater Treatment Standards, Residential Onsite Systems
  6. NYS DOH fact sheet: Need for Licensed Design Professionals, Residential OWTS
  7. Onondaga County WEP, Consolidated Sanitary District service area
  8. Onondaga County WEP Plumbing Control
  9. USDA NRCS Web Soil Survey, Onondaga County (NY067)
  10. USDA NRCS Soil Data Access (SSURGO), septic tank absorption field ratings
  11. Town of Fabius Comprehensive Plan (2005)
  12. Town of Fabius Zoning Law
  13. Town of Fabius government
  14. Fabius, New York
  15. USDA Official Series Description: Mardin
  16. USDA Official Series Description: Honeoye
  17. USDA Official Series Description: Palmyra
  18. USDA Official Series Description: Lordstown
  19. USDA Official Series Description: Arnot
  20. USDA Official Series Description: Lansing
Excavator digging a septic system trench on a Central New York lot
Septic tank and distribution piping set in an open excavation
Finished septic absorption field area graded and ready for topsoil
Get a Real Price

Tell us about the Fabius lot.

Send the address. Estimate in 1 hour.

Free Written Estimate

Estimate in 1 hour.

No spam.
Call Now Get My Price →