Backwell / Asbestos abatement / Asbestos boiler insulation
5.0 stars on Google

Asbestos Boiler Insulation Removal in Syracuse and Upstate NY

  • NYS DOL Asbestos License #591872
  • Jackets, block, breeching and cement
  • Insulation only or the whole boiler

Old cast iron and steel boilers were often covered in asbestos block, hard cement jackets and wrapped breeching to the chimney. We clear boiler rooms in homes, two-families, apartment buildings, churches, schools and factories across Central New York.

ESTIMATE IN 1 HOUR!
Send the address and a few photos of the material.
Get My Price
Send it now and you will have a price within 1 hour. 7 AM to 9 PM ET.

Get My Price

Price within 1 hour.

Or call: (315) 810-9558

#591872
NYS DOL License
1 hr
Estimate
5.0★
Google Rating
14
Counties Served
Old boilers

What an asbestos boiler jacket and block insulation look like

Before about 1980, a boiler was often insulated by hand on site. Installers stacked rigid asbestos block insulation against the sides and top, then troweled a hard white or gray cement over it to make a smooth shell. That shell is what most people mean by an asbestos boiler jacket. It can look like plaster, sometimes painted silver or tan, sometimes cracked with chunks missing at the corners.

Newer boilers from the 1950s onward usually came with a factory sheet metal cabinet, but the inside of that cabinet can hold asbestos paper, rope gaskets around the doors and insulation board. The breeching, the large flue pipe running from the boiler to the chimney, was frequently wrapped in the same block and cement. Owners call all of this boiler wrap or boiler plaster.

Where they sit

Asbestos on old boilers in Central New York basements

Syracuse has a lot of big steam boilers sitting in basements that were built for coal and later converted to oil or gas. You find them in 1910s and 1920s two-families in Westcott, the University Hill area and Elmwood, in brick apartment blocks downtown, and in Victorian houses in Skaneateles, Cazenovia and Auburn. Many of these units are the size of a small car and wrapped from floor to flue.

Churches, parish halls and schools from the same era tend to have a dedicated boiler room with two or more units, a long run of insulated breeching and wrapped steam headers overhead. Mills and factory buildings in Oswego, Fulton, Seneca Falls and Utica can have even larger setups. Farmhouses out in Cayuga and Madison counties sometimes have a single smaller boiler in a fieldstone cellar with a low ceiling.

The trigger

Why owners schedule boiler room asbestos abatement

The usual starting point is a dead or failing boiler. The heating contractor quotes a new high-efficiency unit, then sees the wrapped shell and tells the owner the old one cannot come out until the asbestos is gone. Most heating contractors and scrap haulers will not cut up or move a boiler covered in that material, so the job waits on abatement.

Other owners call after a home inspection during a sale, or when an insurer or lender asks about the old boiler in the basement. Some want to convert a steam system to hot water or forced air and need the whole boiler room cleared. Landlords call when an apartment building's old unit is replaced, and owners of closed churches or schools call before a sale or a demolition. A boiler with crumbling insulation should be left alone and not disturbed.

Price within 1 hour. Send the address and a few photos.
For a price

Telling what is on your boiler and sending it in

We do not inspect, test or sample. If you already have a lab result or an asbestos survey of the building, send it along. Without one, we price the boiler insulation as presumed asbestos-containing. With an old boiler that is coming out anyway, that is usually the simplest way to get the job moving.

The right photos make a quick and accurate price possible. Take a wide shot of the whole boiler from a few steps back, a shot of the breeching all the way to the chimney, and close-ups of any damaged areas. Put a person, a door or a tape measure in one photo so we can judge the size. Send these and we reply with a price within 1 hour, 7 AM to 9 PM ET.

The work itself

Asbestos boiler removal from start to finish

A small residential boiler with a sheet metal cabinet can be a few hours of work. A large steam boiler with a full cement jacket, plus its breeching, is commonly a day or a few days. Commercial boiler rooms with several units take longer. Our DOL-certified crew seals the boiler room off from the rest of the building, and the rest of the property stays in use.

The insulation is stripped, bagged and hauled to a permitted landfill. If you want the boiler gone, we remove it after the insulation is off, which lets the steel and iron go out as scrap. The required state notices for the job are ours to file. When we leave, the boiler room is either bare boiler and pipe for the heating contractor or an empty space with capped lines. You receive copies of the waste manifests.

Who calls us

Boiler insulation removal for homeowners, landlords and contractors

Most boiler work is for homeowners and landlords, from one-family houses in Geddes and Salina to multi-unit buildings in Utica and Binghamton. Buyers and sellers call to clear an inspection item before closing. Small jobs are welcome, including one boiler door gasket, one section of breeching or a single small boiler in a cellar.

Plumbing and heating contractors bring us in so they can set the new unit. Property managers call for apartment complexes and office buildings. General contractors use us ahead of interior renovations, and commercial owners call for churches, schools, warehouses and plants with old boiler rooms that have been shut down. The process is the same for each: send the address and photos, get a price back in 1 hour.

Afterward

Installing the new boiler or taking the building down

With the old boiler and its insulation out, the heating contractor can set a new unit, often a much smaller wall-hung or floor model, and run new venting. Many owners use the open space to add a laundry area or storage once the large steam unit and breeching are gone. Pipes that stay get a clean starting point for new insulation.

If the building is coming down, we also do demolition, so abatement and teardown are one company on one schedule. That matters for vacant churches, closed schools and old factory buildings where the boiler room is just one part of a larger job. The asbestos comes out first, and the demolition follows under the same contract.

Service area

Asbestos boiler insulation removal in Syracuse and the surrounding counties

We are based at 4830 W Seneca Turnpike in Syracuse and work throughout Syracuse and Onondaga County, including East Syracuse, North Syracuse, Minoa, Camillus and Lysander. Outside the county we take jobs in Oswego, Cayuga, Cortland, Madison, Oneida, Seneca, Wayne and Jefferson counties, and around Rochester, Utica, Binghamton, Watertown and Elmira. Send the address and photos, or call (315) 810-9558, and we will get back to you with a price in 1 hour.

Typical Cost

What Asbestos Boiler Insulation Removal Costs in Central NY

The price for boiler work depends on the size of the boiler, how much of it is covered, and whether the breeching and nearby piping are part of the job. Access matters a lot: a boiler reached by a wide bulkhead is easier than one down a narrow stair or in a low fieldstone cellar. Taking the whole boiler out adds to the work, while stripping insulation and leaving the unit for the heating contractor costs less.

Typical figures for common asbestos jobs in Central NY:

JobTypical cost
Smallest jobs: one pipe run, one section of duct, one roomFrom about $1,250
Floor tile and mastic, one room$1,500 to $4,500
Pipe insulation$2,000 to $8,000
Ductwork or duct wrap$2,000 to $8,000
How It Works

How the Job Runs

01
Send the address and photos
Estimate in 1 hour, 7 AM to 9 PM ET.
02
Tested or presumed
We remove, we do not test. Send an existing lab report with your photos, or we price the material as presumed asbestos-containing.
03
Notifications filed
NYS DOL and occupant notices handled for you under Industrial Code Rule 56.
04
Removal
Our own DOL-certified crew removes the material.
05
Legal disposal
Bagged, labeled and hauled to a permitted landfill. Waste manifests to you.
06
Demo if you need it
Tearing the building down after? Same company, one schedule.
Common Questions

Asbestos Boiler Insulation Questions

It can be. Hard white or gray cement over block on boilers installed before about 1980 commonly contains asbestos. We do not test it. If you have a lab report, send it with your photos. If not, we price the boiler jacket as presumed asbestos-containing, which is how most owners proceed when the boiler is being replaced.
Yes. Many owners want the asbestos boiler removal and the insulation work done together, so the heating contractor arrives to an empty room. We strip the insulation first, then remove the boiler. Tell us when you send photos and include a shot of the stairs or bulkhead so we can see the path out of the building.
It can. Factory cabinets from the middle of the last century sometimes have asbestos paper or board on the inside, rope gaskets around the doors, and cement around the burner opening. The outside looks clean, but the inside can still hold material that a heating contractor will not touch. Send photos with the front panel off if you can do that safely.
Breeching is the large flue pipe that carries exhaust from the boiler to the chimney. On older systems it was often covered in asbestos block and a hard cement finish, just like the boiler. It runs overhead, so people forget it. When you send photos, follow the breeching from the boiler all the way to where it enters the chimney.
Yes. Commercial boiler rooms often have two or more large units, long runs of breeching and wrapped headers. The work takes longer than a house, and access through the building matters. Send photos of each boiler, the overhead piping and the route from the boiler room to the outside, along with the address.
Yes, the boiler has to be off and cooled before we work on its insulation. In most cases the boiler is being replaced, so it is already off or about to be. If you need heat in the building during the work, talk to your heating contractor about temporary heat while the boiler room is closed.
In many cases, yes. If the boiler is staying in service and only a corner or a section of the cement shell is breaking up, we can remove that part. Some owners choose to clear the whole jacket at once so the boiler can be reinsulated with modern material. Send photos of the damage and the full unit.
We file the required state notices for the job. After the waste is hauled to a permitted landfill, you receive copies of the waste manifests showing where the material went. Owners keep those for the sale of the building, for insurers or lenders, and for their own records of the boiler room work.
Once the asbestos insulation is stripped and bagged, the bare cast iron or steel boiler is ordinary scrap. If we are removing the boiler, we handle it as part of the job. If you are leaving the boiler for your heating contractor or a scrap hauler, it will be bare metal when we finish.
By Material

Other Asbestos Materials We Remove

Get Your Price

Send the address and a few photos. Estimate within 1 hour, 7 AM to 9 PM ET.

Get My Price ☎ (315) 810-9558

Service areas