Backwell / Asbestos abatement / Asbestos roofing
5.0 stars on Google

Asbestos Roof Removal in Syracuse and Central New York

  • NYS DOL Asbestos License #591872
  • Shingles, felt, flashing cement and tar
  • Pitched roofs and flat built-up roofs

We remove slate-look cement shingles, old roofing felt, flashing cement and roof tar from houses, garages, churches, mills and flat commercial roofs. Our crew works across Syracuse and Upstate New York, from one porch roof to a whole building.

ESTIMATE IN 1 HOUR!
Send the address and a few photos of the material.
Get My Price
Send it now and you will have a price within 1 hour. 7 AM to 9 PM ET.

Get My Price

Price within 1 hour.

Or call: (315) 810-9558

#591872
NYS DOL License
1 hr
Estimate
5.0★
Google Rating
14
Counties Served
On the roof

Slate-look asbestos shingles and asbestos cement roof panels

Asbestos roofing in Central New York comes in a few forms. The most common on houses is the slate-look asbestos shingle: a stiff cement shingle, often about 9 by 16 inches, sometimes cut in a diamond or hexagon pattern, in gray, red, green or black. From the ground it passes for slate. Up close it is thinner, lighter and evenly colored, and a broken piece shows a gray cement core.

Larger asbestos cement roof panels, flat or corrugated, cover barns, mill sheds and industrial buildings. Some older asphalt shingles can also contain asbestos, though less commonly than the cement types. These products went on roofs from the 1910s through the 1970s, and many cement shingle roofs are still in place because they last a long time when nobody walks on them.

Under and around

Asbestos roofing felt, flashing cement and roof tar

What sits under and around the shingles matters as much as the shingles. Black asbestos roofing felt was used as underlayment on many roofs through the 1970s. Asbestos flashing cement, a thick black paste, was troweled around chimneys, vent stacks, skylights and anywhere a roof meets a wall. Asbestos roof tar and mastic were brushed over seams and leaks, sometimes decades of patches stacked on each other.

Built-up roofs are the flat roofs on storefronts, schools, apartment blocks and factories: layers of felt and hot tar with gravel on top. A built-up roof with asbestos can have it in the felt, the tar, the flashing or all of them. Older lab reports on these roofs often list several layers of different ages, each with its own result.

Where it shows up

Asbestos roofing shingles on Syracuse area buildings

On houses, slate-look cement shingles show up on 1910s and 1920s foursquares in Sedgwick and the Outer Comstock area, on Tudor and colonial revival houses near Westcott and the University neighborhood, and on farmhouses from Pompey to LaFayette. Porch roofs, bay window roofs and dormers often still have them even when the main roof was switched to asphalt years ago.

Flat built-up roofs with asbestos are common on downtown Syracuse storefronts, on 1950s and 1960s schools and church halls, and on mill and warehouse buildings in Oswego, Fulton, Auburn and Little Falls. Detached garages from the 1940s and 1950s in Solvay, Westvale and East Syracuse often carry cement shingles or corrugated panels, and barns in Madison and Cayuga county farm country have long runs of them.

Price within 1 hour. Send the address and a few photos.
Why people call

Roof replacements and other reasons for asbestos roof removal

Most of these calls come from a roof that is failing and a roofer who will not touch the old layer. Many roofers will not tear off cement shingles, asbestos felt or old flashing cement until a licensed crew has removed it. Other calls come when a sale or refinance turns up the roof material, when an insurer asks about it, or when a building is coming down.

If shingles are broken or a storm has thrown pieces into the yard, leave them alone and keep people off that part of the roof. Do not pressure wash, scrape or patch over it. Photos of the pieces where they landed help us price the yard cleanup together with the roof.

Getting a price

What to send for an asbestos roof removal price

Send the address and photos from the ground showing each roof face, plus a close-up of the shingles or roof surface with something for scale, like a hand or a tape measure. Add a photo of the chimney flashing and any flat sections if you can. Tell us the number of stories, the pitch in plain words such as low, medium or steep, and how many layers you think are up there.

A rough size helps. A roofer's measurement in squares, the footprint of the house, or the length and width of a garage is enough. If a lab report exists, send it. If not, we price the roof material as presumed asbestos-containing. You get a price in 1 hour, 7 AM to 9 PM ET, by text or email, and the phone is (315) 810-9558.

On the job

How a roof tear-off with asbestos goes

Our own DOL-certified crew does the removal, and we file the required state notices. The work area on and around the roof is closed off from the rest of the property. The ground below is covered and roped off, nearby windows and vents are closed and covered, and the roofing comes off, is bagged, lowered and hauled to a permitted landfill.

A garage roof or a porch roof is often done in hours. A full house roof or a large flat roof usually runs a day or a few days, and weather plays a bigger part than it does on indoor work. When we leave, the roof is down to the deck boards or sheathing and the ground is clean. Most owners line up the roofer to follow close behind. Waste manifests come to you once the material is landfilled.

Who we work for

Roofers, owners and managers who bring us in

Roofing contractors are a big part of this work. They price the new roof, we take off the asbestos layer, and their crew starts on a clean deck. Homeowners call before a re-roof or when a chimney rebuild needs the flashing out. Landlords with two-family and three-family houses on the Near Westside and the North Side call between tenants or after a leak.

Property managers call about flat roofs on apartment blocks and plazas. General contractors call when a renovation or addition ties into an old roof. Churches and commercial owners call when a built-up roof finally has to go. Buyers and sellers call when a closing condition names the roof. Small jobs are welcome, including a single porch roof, a dormer or one shed.

After removal

A new roof, or the building comes down

With the asbestos layer gone, the roofer can replace rotted boards, put down new underlayment and install asphalt, metal or real slate, or a membrane on a flat roof. Chimney masons can rebuild the flashing against clean brick. The waste manifests show where the old material went, which some lenders and buyers ask to see.

If the structure is not worth saving, we also demolish. A barn with a corrugated roof, a garage with cement shingles, or a building cleared for redevelopment can be abated and taken down by one company on one schedule. The asbestos roofing comes off first, then the frame comes down and is hauled away.

Service area

Asbestos roof removal in Onondaga County and beyond

We work from our office at 4830 W Seneca Turnpike in Syracuse. We take roof jobs throughout Onondaga County, including DeWitt, Onondaga Hill, Jamesville and Cicero, and in Oswego, Cayuga, Cortland, Madison, Oneida, Seneca, Wayne and Jefferson counties. We also cover the Rochester, Utica, Binghamton, Watertown and Elmira areas, where old housing and farm buildings carry the same cement shingles and tar roofs.

Typical Cost

What Asbestos Roofing Removal Costs in Central NY

The price depends on roof size, pitch and height, how many layers are on the deck, and whether felt, flashing cement and tar are part of the job. Steep or tall roofs, chimneys and skylights, and flat roofs with many patched layers take more time than a low garage roof with one layer.

Typical figures for common asbestos jobs in Central NY:

JobTypical cost
Smallest jobs: one pipe run, one section of duct, one roomFrom about $1,250
Floor tile and mastic, one room$1,500 to $4,500
Pipe insulation$2,000 to $8,000
Ductwork or duct wrap$2,000 to $8,000
How It Works

How the Job Runs

01
Send the address and photos
Estimate in 1 hour, 7 AM to 9 PM ET.
02
Tested or presumed
We remove, we do not test. Send an existing lab report with your photos, or we price the material as presumed asbestos-containing.
03
Notifications filed
NYS DOL and occupant notices handled for you under Industrial Code Rule 56.
04
Removal
Our own DOL-certified crew removes the material.
05
Legal disposal
Bagged, labeled and hauled to a permitted landfill. Waste manifests to you.
06
Demo if you need it
Tearing the building down after? Same company, one schedule.
Common Questions

Asbestos Roofing Questions

Real slate is thicker and heavier, with natural split edges and color that varies piece to piece. Slate-look asbestos shingles are thinner and uniform in color, often with a faint pressed pattern, and a broken edge shows a gray cement core. Many roofers can tell from photos. If it is cement, we price it as presumed asbestos unless a lab report says otherwise.
Some roofs already have asphalt laid over cement shingles. That leaves the old layer in place for the next tear-off, and many roofers will not nail through cement shingles because they crack. Most owners paying for a full new roof have the asbestos layer removed first so the new roof goes on a solid deck.
It can. Roof tar, mastic and felt on built-up roofs put down through the 1970s commonly contained asbestos, and later patches were often laid over the older ones. A lab report would show which layers. Without one, we price the built-up roof as presumed asbestos-containing material, every layer down to the deck.
Yes. Asbestos flashing cement around a chimney, a vent stack or a skylight is a small job we take on its own. It often comes up when a mason is rebuilding a chimney or a roofer is replacing one section. Send a close photo of the flashing and a wider photo showing where it sits on the roof.
Clear access to the driveway and the sides of the building, cars moved away from the walls, and kids and pets kept out of the marked zone. Keep windows closed on the sides being worked. Inside, people can usually go about their day, since roof work happens outside the living space.
On roofs from the middle of the last century it turns up often. Black felt underlayment from that era can contain asbestos, and it frequently sits under a later asphalt layer. When a roofer finds old felt during a tear-off, they usually stop and call. Photos of the felt and the shingles above it are enough for us to price it.
Weather matters more on a roof than on any indoor job. Rain, high wind, ice and heavy snow can push the work back, because the crew needs safe footing. Timing is set once you accept the price, and we line it up with the roofer so the deck is not left open longer than it has to be.
Yes. Corrugated asbestos cement roofing on barns, sheds and mill buildings comes off in panels, which are wrapped and hauled to a permitted landfill. Height and the condition of the roof framing affect how the job is set up. If the barn is coming down afterward, we demolish it on the same schedule.
By Material

Other Asbestos Materials We Remove

Get Your Price

Send the address and a few photos. Estimate within 1 hour, 7 AM to 9 PM ET.

Get My Price ☎ (315) 810-9558

Service areas