We remove asbestos window putty, glazing compound and caulk from wood sash, steel sash windows, storefronts and door frames. Our crew handles houses, schools, churches, mills and commercial buildings across Syracuse and Upstate New York before new windows go in.
Price within 1 hour.
Glazing compound is the putty that holds a pane of glass in its sash. On older windows it is the beveled bead along the outside edge of each pane, usually painted along with the frame. Caulk is the bead that seals the window or door frame to the wall. Through the 1970s, both were commonly mixed with asbestos fiber so they would hold up longer, and old putty and caulk can still contain it.
Old asbestos glazing compound is hard and brittle, often cracked into short chunks. After many coats of paint it looks like part of the frame. Old caulk at the frame edge is gray, tan or white, stiff, and pulls away in strips or crumbles. Modern latex and silicone caulk stays soft and rubbery. If the windows and their putty date from before the 1980s, we treat the putty as presumed asbestos unless a lab report shows otherwise.
Steel sash windows are the classic case. Mills, factories, schools and warehouses built from the 1920s through the 1960s have rows of steel frames with dozens of small panes, each set in putty. You see them on old industrial buildings along the canal corridor, in Oswego and Fulton mill buildings, in Near Westside warehouses in Syracuse, and on school buildings across Onondaga and Oneida counties. Many house basement windows are small steel sash too.
Wood sash windows in 1910s and 1920s houses in Strathmore, Sedgwick and Eastwood are puttied the same way, as are old porch storms and church windows in villages from Cazenovia to Skaneateles. Storefronts in downtown Syracuse, Auburn and Cortland have long runs of caulk around display glass and doors, and 1950s and 1960s schools and office buildings carry caulk along every exterior opening.
Window replacement with asbestos glazing is the most common reason for the call. A window company or general contractor gets a contract to replace old sash, a pre-job report shows asbestos in the putty or caulk, and the installer stops until it is out. Many window installers will not pull old steel or wood sash while asbestos putty is still in it. Other calls come from:
Cracked putty falling out of an old window is common. Leave the loose pieces where they are and do not scrape, sand or heat gun the sash. Photos of the windows and the condition of the putty are what we need to price the job, along with a rough count of how many windows there are.
Asbestos caulk removal is a little different from putty work. Caulk runs along the joint where the window or door frame meets brick, block or siding, and on commercial buildings it can also run along expansion joints and between precast panels. When the frames are coming out, the caulk comes out of the joint first. When only the caulk is being replaced and the windows are staying, we take out the old bead and leave the joint clean for the sealant contractor.
Some projects involve both: putty in the sash and caulk at the frame. The two can have different lab results, so a report that covers one does not settle the other. If you have results for one and not the other, send what you have. Whatever has no lab result is priced as presumed asbestos-containing material.
Send the address and a count: how many windows, roughly what size, and whether they are wood or steel. A photo of the whole wall and a close-up of one window with a hand or tape measure for scale tells us most of what we need. For steel sash, the number of panes per window matters as much as the number of windows. For caulk, tell us roughly how many openings have it.
Tell us whether the windows are coming out entirely or staying, and what floors they are on, since upper floors on mills and schools may need a lift. Send any lab report or the window contractor's scope if you have one. Without a report, putty and caulk are priced as presumed asbestos. You get a price in 1 hour, 7 AM to 9 PM ET. Text or email, or call (315) 810-9558.
Our own DOL-certified crew does the work, and we file the required state notices. The work area is sealed off from the rest of the building at each window or group of windows, inside and out as needed. Depending on the plan, the putty and caulk are removed from sash that stays, or the whole sash comes out with its putty and goes out as asbestos waste. Either way it is bagged and hauled to a permitted landfill.
A few house windows can be a matter of hours. A full house, a storefront, or a building with rows of steel sash can take a day, a few days, or longer on big buildings, often working floor by floor ahead of the installer. When the crew leaves, the openings are ready for new windows or for reglazing, and you get the waste manifests. Most owners have the installer follow close behind.
Window replacement companies and general contractors are the biggest group. They win the window job, find asbestos glazing compound or caulk in the scope, and need the material out ahead of their crew. Homeowners call before replacing original wood windows. Landlords call when a two-family on the Westside is getting new windows between tenants, and buyers and sellers call when a closing depends on it.
Property managers call about apartment blocks with rows of original windows. Churches call before restoring or replacing old sash. Commercial owners, school facilities staff and developers turning old mills into apartments call about steel sash and storefront glazing. Small jobs are welcome. One window, one door frame or one storefront is a normal job for us.
Once the asbestos is out, the window crew sets new units, or a restoration carpenter reglazes the old sash with modern putty. Masons can repoint around the new frames, and sealant contractors run new caulk at the joints. The waste manifests show the old glazing and caulk went to a permitted landfill, which is often part of the closeout paperwork on school and commercial projects.
When the building is coming down instead of getting new windows, we handle the asbestos and the demolition. The putty, caulk and any other asbestos materials come out first, then we take the building down and haul it away. One company and one schedule replaces the usual handoff between an abatement contractor and a separate demolition outfit.
We work out of 4830 W Seneca Turnpike in Syracuse and cover Onondaga County, including Solvay, Geddes, Fayetteville and North Syracuse. We take window glazing jobs in Oswego, Cayuga, Cortland, Madison, Oneida, Seneca, Wayne and Jefferson counties, and in the Rochester, Utica, Binghamton, Watertown and Elmira areas, where old schools, mills and downtown blocks still have original steel and wood sash.
The price depends on the number of windows and panes, whether the sash is wood or steel, and whether the windows are staying or coming out whole. Height is a big factor on mills and schools, and caulk at the frame adds time on top of the putty in the sash.
Typical figures for common asbestos jobs in Central NY:
| Job | Typical cost |
|---|---|
| Smallest jobs: one pipe run, one section of duct, one room | From about $1,250 |
| Floor tile and mastic, one room | $1,500 to $4,500 |
| Pipe insulation | $2,000 to $8,000 |
| Ductwork or duct wrap | $2,000 to $8,000 |
Send the address and a few photos. Estimate within 1 hour, 7 AM to 9 PM ET.