Floor tile, pipe and boiler insulation, ceiling tile, duct wrap, roofing and transite in commercial buildings. We remove it from offices, retail stores, schools, churches, industrial plants and apartment buildings across Central and Upstate New York.
Price within 1 hour.
A commercial building is rarely one material. A typical older building in Central New York has a few of them spread through different spaces: tile and black mastic on the sales floor, wrapped pipe in the mechanical room, a lined boiler or breeching, cement panels on an exterior wall, a layer of old roofing under the newer one. Most of these went in from the 1920s through the 1970s, and some products stayed in use later.
Building staff and tenants know these materials by plain names. Nine-by-nine tile, the white wrap on the pipes, the boiler lagging, the cement board, the old tar roof, the duct tape on the air handler. Drawings and surveys use longer names, like thermal system insulation or asbestos-containing roofing. Either way, we price from what you can show us and whatever report you already have.
Office space in downtown Syracuse, the brick blocks around Armory Square, and suburban office parks in DeWitt and Liverpool commonly have tile under the carpet and wrapped pipe above the ceiling. Retail storefronts on North Salina Street, in the villages of Baldwinsville, Skaneateles and Seneca Falls, and in strip plazas along Route 31 often have layered flooring that goes back decades. Restaurants and bars add kitchens with old tile and a basement full of pipe.
Schools, churches and parish halls usually have a steam plant in the basement, with insulated mains running to every room, plus classrooms or fellowship halls with original tile. Churches in Utica, Auburn and the Syracuse neighborhoods often have plaster and old roofing too. Industrial plants in Oswego, Fulton and along the Erie Canal corridor bring larger versions of the same thing, with long overhead runs and old process equipment.
Apartment buildings sit between residential and commercial work. A three-story walk-up on the Northside or in Tipp Hill, a brick block with stores on the ground floor and flats above, or a garden complex from the 1960s in Camillus or North Syracuse can have asbestos in the boiler room, the halls and each unit. Owners usually deal with it a unit or a system at a time.
The common requests are a boiler room cleared before a new heating plant, a unit gutted during turnover, or hallway flooring removed before new flooring goes down. We price units one at a time or as a group, from photos of each. The building stays occupied while the work area is sealed off from the rest of the floor and the other units.
Most commercial calls come from a project that is already moving. A new tenant signed a lease and the space needs to be stripped. The boiler failed and the heating contractor will not start until the room is clear. A roof is being replaced and the old layers have asbestos. A buyer wants the materials addressed before closing, or a lender asked for it as a condition of the loan.
General contractors bidding a renovation usually have drawings, a scope and often a survey from an outside firm. Send all of it along with the address and a few site photos, and we return a price for the abatement line. Owners without drawings can send photos of each area and a rough measurement, like square feet of floor, feet of pipe, or the number of rooms or units.
If there is no survey or lab report, we price the materials as presumed asbestos-containing. That gives the owner or the general contractor a number to carry in the budget. If a report shows up later, send it, and the price can be adjusted to match. Photos should include something for scale, such as a door, a person or a tape measure.
You get a price within 1 hour, 7 AM to 9 PM ET. Larger multi-floor packages may need a little more time to review the drawings, and we say so when that happens. The phone number is (315) 810-9558. Nothing has to be opened up or moved to get a range, and photos from a phone are plenty.
Each work area is sealed off from the rest of the building before removal starts. In a mechanical room that might be the room itself, with the door and any openings covered. On a sales floor or in a school wing it can be a set of rooms or one end of a corridor. The material is removed, bagged and hauled to a permitted landfill, and the work is done by our own DOL-certified crew.
A mechanical room or a single tenant space can be done in a day to a few days. A full floor, a school wing or a plant takes longer and is often split into phases so the rest of the building keeps running. When each area is finished, it is clean and ready for the next trade. We file the required state notices, and the owner gets the waste manifests.
After abatement, the project goes on to the work that started it. The heating contractor sets the new boiler and pipes it in. Flooring installers lay new tile or carpet on a clean slab. The roofer tears off to the deck and builds a new roof. The general contractor brings in framing, drywall and finishes for the tenant. Nothing in that sequence has to wait on the old materials once they are out.
If part of the building or the whole building is being demolished, we do that too. Abatement and demolition are one company and one schedule, which helps on additions, outbuildings and whole sites where several structures are coming down. The owner deals with one contractor from the first price to the end of the job.
Our office is at 4830 W Seneca Turnpike, Syracuse NY 13215. We take commercial asbestos jobs throughout Syracuse and Onondaga County, and in Oswego, Cayuga, Cortland, Madison, Oneida, Seneca, Wayne and Jefferson counties. We also work in the Rochester, Utica, Binghamton, Watertown and Elmira areas, where owners and general contractors send drawings and photos the same way. Small jobs are welcome: one room, one boiler, one run of pipe.
The price depends on how many different materials are involved and how much of each, how high and how crowded the work areas are, and how much of the building has to stay open while the work goes on. Phasing around tenants or school calendars, the condition of the material, and access for hauling all move the number.
| Job | Typical cost |
|---|---|
| Pipe insulation | $2,000 to $8,000 |
| Ductwork or duct wrap | $2,000 to $8,000 |
| Floor tile and mastic, one room | $1,500 to $4,500 |
Send the address and a few photos. Estimate within 1 hour, 7 AM to 9 PM ET.