We remove transite flue pipe, asbestos cement chimney liners, vent pipe, water and sewer lines, and transite duct buried under slabs. Our crew works in basements, chimneys, crawlspaces and trenches across Syracuse and Upstate New York.
Price within 1 hour.
Transite is a trade name that stuck. Builders and plumbers use it for any pipe made of cement mixed with asbestos fiber. It is gray, hard and smooth on the outside, with a thick wall and plain ends or bell ends where sections join. A cut or broken end shows dense gray cement with no metal and no clay. Some pieces still carry a faded printed stamp along the side.
Asbestos cement pipe was made from the 1930s through the 1970s, in sizes from a few inches across up to large water mains. In houses it was used as flue pipe off boilers, furnaces and water heaters, as liners dropped down masonry chimneys, and as vent pipe. Outside it was buried as water service, sewer laterals and storm drains, and under some slabs it was used as heating duct.
The most common call is the gray flue pipe running from an old boiler or water heater into the chimney. In 1920s two-family houses in the Valley, Eastwood and the Near Eastside, it is often a short run of transite between a cast iron steam boiler and the brick chimney thimble. In 1950s and 1960s ranches in Camillus, Clay and Cicero, it can connect a gravity or forced-air furnace to an interior chimney.
Asbestos chimney liners show up when a sweep looks down from the roof and sees a round gray pipe instead of clay tile. Those were dropped in to reline old brick chimneys from the 1940s on. Farmhouses in Onondaga and Madison counties, schools and churches with old boiler rooms, and small commercial buildings in Fulton and Oswego also have long runs of transite vent pipe and flue.
Some ranch and split-level houses built on slabs in the 1950s and 1960s, around Salina, DeWitt and Liverpool, used transite duct under the slab to carry heat to floor registers along the outside walls. If you lift a floor register and see a round gray pipe going down into the concrete, that is likely what it is. When the furnace is replaced, the HVAC installer has to decide whether to reuse, abandon or remove it.
Outside, asbestos water or sewer pipe turns up when a lateral is dug up for repair, when a yard is regraded, or when an old foundation is cleared. Excavators and plumbers often stop when they hit gray cement pipe. We remove the exposed sections from the open trench, or from under the slab where it has been cut open, so their work can go on.
Almost every call about transite is tied to an equipment change or a dig. Many plumbers and HVAC installers will not take apart an asbestos flue pipe or touch a transite vent until it has been removed, and that puts the new boiler or water heater on hold. These are the triggers we hear about most around Syracuse:
If a flue pipe is cracked or a section has dropped, leave it where it is and do not sweep up the pieces. Keep people out of that part of the basement and have your heating contractor look at the appliance, since a broken flue affects venting. Then send us the photos and we price the removal.
Send the address and photos of the pipe from end to end. Take one wide photo showing where it starts and where it enters the chimney or wall, and one close photo with a hand or tape measure for scale. Tell us roughly how long the run is, how many elbows or sections there are, and whether the pipe is in a basement, in a chimney, under a slab or in a trench.
For a chimney liner, add the chimney height and any photo a sweep or roofer took from the top. If there is a lab report, include it. If there is not, we price the pipe as presumed asbestos-containing. We reply with a price in 1 hour, 7 AM to 9 PM ET. Text or email the photos, or call (315) 810-9558.
The removal is done by our DOL-certified crew, and we handle the required state notices. The work area is sealed off from the rest of the building, which for a basement flue usually means the boiler room or the part of the basement around the chimney. The pipe is taken down, bagged and hauled to a permitted landfill. Chimney liners come out from the top, the bottom or both.
A single flue pipe is often a job of a few hours. A chimney liner, a long vent run or several sections under a slab can take a day or more. The rest of the house stays in use. When the crew leaves, the pipe is gone, the chimney thimble or slab opening is clear for the installer, and you receive the waste manifests.
Plumbing and heating contractors are the biggest group. They sell the new boiler or water heater, find transite between the old unit and the chimney, and call to have it taken out before install day. Homeowners call when a sweep or an installer flags the pipe. Landlords call when a heating system fails in a rental and the replacement cannot wait.
Excavators and sewer contractors call when they hit gray pipe in a trench. General contractors call for renovations that open up a chimney or a slab. Property managers and commercial owners call about boiler rooms with longer runs. Buyers and sellers call when a closing hinges on it. Small jobs are welcome, and one short piece of flue pipe is a normal job for us.
Once the transite is out, the installer can set the new boiler, furnace or water heater and run new venting. Masons and sweeps can put a stainless or clay liner in the chimney. In slab houses, the HVAC contractor can abandon the old floor ducts and run new ductwork overhead. The waste manifests go in the file with the new equipment paperwork.
When the whole building is going, the pipe is part of a bigger job. We remove the transite and other asbestos materials, then demolish the house, garage or commercial building and haul it out. One company handles the abatement and the demolition on the same schedule, so the lot is ready for the next step without a gap between contractors.
We are based at 4830 W Seneca Turnpike in Syracuse and work across Onondaga County, from Baldwinsville and Lysander to Tully and Skaneateles. We also take transite pipe jobs in Oswego, Cayuga, Cortland, Madison, Oneida, Seneca, Wayne and Jefferson counties, and in the Rochester, Utica, Binghamton, Watertown and Elmira areas. Plumbing and heating contractors anywhere in that region can send photos straight from the job.
The price depends on how much pipe there is, how many sections and elbows, and where it sits: open basement, inside a chimney, under a slab or in a trench. Chimney height, tight crawlspaces and broken pipe add time compared with a short run of intact flue pipe in an open basement.
Typical figures for common asbestos jobs in Central NY:
| Job | Typical cost |
|---|---|
| Smallest jobs: one pipe run, one section of duct, one room | From about $1,250 |
| Floor tile and mastic, one room | $1,500 to $4,500 |
| Pipe insulation | $2,000 to $8,000 |
| Ductwork or duct wrap | $2,000 to $8,000 |
Send the address and a few photos. Estimate within 1 hour, 7 AM to 9 PM ET.