Asbestos Fireproofing Removal in Syracuse and Upstate NY

  • NYS DOL Asbestos License #591872
  • Beams, columns and deck above the ceiling
  • One bay or a full floor, same process

Sprayed fireproofing on steel beams, columns and the underside of metal deck, in fluffy or hard cement form. We remove it from offices, schools, stores, warehouses and plant additions across Central New York.

ESTIMATE IN 1 HOUR!
Send the address and a few photos of the material.
Get My Price
Send it now and you will have a price within 1 hour. 7 AM to 9 PM ET.

Get My Price

Price within 1 hour.

Or call: (315) 810-9558

#591872
NYS DOL License
1 hr
Estimate
5.0★
Google Rating
14
Counties Served
The Material

What Sprayed Asbestos Insulation on Steel Looks Like

Asbestos fireproofing is a coating that was sprayed or troweled onto structural steel to slow the heat of a fire reaching the frame. It went on from the 1950s into the 1970s, mostly in steel-frame buildings. Depending on the mix, it looks like gray or off-white cotton candy, a lumpy stucco, or a hard crust a little like cement. People call it spray-on fireproofing, fluff, beam coating, sprayed asbestos insulation, or SFRM on the drawings.

Not every sprayed coating from those years contains asbestos. Some products used mineral wool, gypsum or cement instead, and the soft, fibrous mixes are the ones that commonly do. Older buildings are often patched with newer material, so a single floor can carry two or three different products. Fireproofing that is hanging in strands, falling onto ceiling tiles or crumbling at a touch should be left alone and not disturbed until it is removed.

Where It Is

Commercial Building Fireproofing Across Central New York

In Syracuse it shows up in mid-century office buildings downtown and along South Salina Street, in medical offices on University Hill, and in flex and warehouse space around Carrier Circle and East Syracuse. Schools built or added onto in the 1960s often have it above the classroom ceilings and over the gym. Bank branches, telephone buildings, parking garages and a few church additions from the same years can have it too.

Out in the counties it turns up in plant additions in Fulton and Oswego, in steel-frame stores in Auburn and Cortland, and in office wings attached to older brick mills in Utica and Rome. The common thread is a steel frame put up from the 1950s into the 1970s. Wood-frame houses rarely have fireproofing, though a house with a steel beam in the basement sometimes carries a sprayed coating on that one beam.

Why People Call

Fireproofing Removal Before Renovation and Other Common Reasons

Most calls start when somebody needs to work above the ceiling. A tenant fit-out needs new ductwork, a sprinkler contractor needs to hang new mains, or an electrician needs to run conduit across the steel. Many HVAC installers, sprinkler fitters and electricians will not touch the space until the asbestos on the steel beams is out of their work path.

Sometimes the call comes after a ceiling tile is lifted and gray fluff drops out. If that happens, set the tile back in place, keep people out of that room, and send us photos from a distance. A small area like that is a job we take on its own, without waiting for a larger renovation to come together.

Price within 1 hour. Send the address and a few photos.
Getting a Price

What to Send for a Spray-On Fireproofing Abatement Price

A price starts with the address and a few photos. If an outside firm has already done a survey or lab report on the building, send that too. If there is no report, we price the fireproofing as presumed asbestos-containing material, which is how most commercial owners start. The more we can see of the steel, the deck and what sits underneath, the tighter the range comes back.

Photos taken from a mechanical room, an access hatch or a spot where a ceiling tile is already missing are fine. Leave tiles in place. A shot of the floor plan or a fire escape map helps on larger buildings. We send a price within 1 hour, 7 AM to 9 PM ET. The phone number is (315) 810-9558 if you would rather call with the address.

On Site

How Removing Asbestos on Steel Beams Runs Inside the Building

The work area is sealed off from the rest of the building before any material comes down. In an office tower that is usually the suite or the floor, with corridors and neighboring tenants kept apart from it. In a warehouse it may be a set of bays. The material is removed from the steel and deck, bagged, and hauled to a permitted landfill. The work is done by our own DOL-certified crew.

A few beams over one office can take hours to a day. A full floor or a large warehouse ceiling runs longer, and the time depends on area, height and how hard the coating is. When the crew leaves, the steel is bare and the area is clean and ready for the next trade. We file the required state notices, and you receive the waste manifests for your records.

Who We Work For

Fireproofing Abatement for Owners, Managers and Contractors

Most fireproofing work comes from commercial owners, property managers and general contractors with a renovation on the calendar. We also work for HVAC, sprinkler and electrical contractors who need a clear path through the ceiling, for buyers and sellers sorting out a commercial building before a sale, and for school districts and churches redoing an addition. Each one gets the same thing: the material out and the paperwork in hand.

Small jobs are welcome. One beam where a new duct needs to pass, one column getting a new enclosure, or one bay of deck under a leaking roof drain is a normal request. Larger floors are priced the same way, from the address, photos and a rough size. A general contractor bidding a fit-out can send drawings or ceiling photos and get a range back within the hour.

After Removal

New Fireproofing, New Systems or Demolition After Abatement

Once the old material is off, the steel usually needs new fireproofing to keep the building's fire rating, and that coating is applied by the fireproofing or drywall contractor on the project. Ducts, sprinkler mains and conduit go up on clean steel first. Then the ceiling grid and tile go back in, and the space is turned over to the tenant or the owner.

If the building or an addition is coming down instead, we also do demolition. Abatement and the teardown are one company and one schedule, with no handoff between two contractors and no gap while a second crew gets lined up. That matters most on steel-frame buildings, where the fireproofing has to come off the frame before the frame itself can come down.

Service Area

Asbestos Fireproofing Removal in Syracuse and Upstate New York

Our office is at 4830 W Seneca Turnpike, Syracuse NY 13215. We work across Syracuse and Onondaga County, including Liverpool, Clay, Cicero, DeWitt, Camillus and Solvay, and in Oswego, Cayuga, Cortland, Madison, Oneida, Seneca, Wayne and Jefferson counties. We also take fireproofing jobs in the Rochester, Utica, Binghamton, Watertown and Elmira areas. Send the address and photos from anywhere in that range for a price.

Typical Cost

What Asbestos Fireproofing Removal Costs in Central NY

The price depends on how many square feet of steel and deck are coated, how high it sits, and whether the space is open or crowded with racking, ductwork and occupied offices. Soft fluffy fireproofing comes off differently than a hard cement coating, and wet or delaminating material adds cleanup.

How It Works

How the Job Runs

01
Send the address and photos
Estimate in 1 hour, 7 AM to 9 PM ET.
02
Tested or presumed
We remove, we do not test. Send an existing lab report with your photos, or we price the material as presumed asbestos-containing.
03
Notifications filed
NYS DOL and occupant notices handled for you under Industrial Code Rule 56.
04
Removal
Our own DOL-certified crew removes the material.
05
Legal disposal
Bagged, labeled and hauled to a permitted landfill. Waste manifests to you.
06
Demo if you need it
Tearing the building down after? Same company, one schedule.
Common Questions

Asbestos Fireproofing Questions

No. Fireproofing sprayed from the 1950s into the 1970s commonly contained asbestos, but many products used mineral wool, gypsum or cement without it. Material from different years is often mixed on one floor. A lab report from an outside firm tells you what is there. Without one, we price the coating as presumed asbestos-containing material.
Yes. Small areas are a normal job: a few beams over one office, a single column, or the strip of deck where a new duct or sprinkler main will run. Send photos and a rough size, and we price that area by itself. The rest of the floor can stay as it is until a later project.
In most steel buildings, yes. The steel was coated to meet a fire rating, and that rating usually has to be restored. New fireproofing is applied by the fireproofing or drywall contractor on the job, after the other trades finish their work on the steel. The architect or general contractor sets that scope.
Often it can. The work area is sealed off from the rest of the building, so in many cases neighboring tenants, corridors and other floors keep running. How much has to close depends on the layout, the HVAC system and where the material is. Tell us which spaces are occupied when you send photos.
Leave it alone and keep people out of the area. Do not sweep or vacuum it up. Set any lifted tiles back in place, take photos from a distance, and send them with the address. Loose material sitting on top of the tiles is removed along with the coating on the steel.
The underside of metal deck is often the largest surface in the job, and the corrugations hold more material than a flat beam face. Access matters as much as the material. Deck over an open warehouse floor is a different job than deck above an occupied office with ducts and lights in the way.
Yes. Columns are often boxed in with drywall or block, with the fireproofing inside. If the enclosure is coming off for the renovation, we remove the coating on the column once it is open. Photos of the enclosures and a count of how many columns are involved are enough to price it.
We file the required state notices for the job. When the work is finished, you receive the waste manifests showing the material went to a permitted landfill. Owners and general contractors usually keep these with the project closeout file, and buyers and lenders sometimes ask to see them later.
Yes. Much of our fireproofing work is for general contractors and property managers with a tenant fit-out underway. We remove the material ahead of the trades that need the ceiling. If a wing of the building is being demolished as part of the project, we can take on that demolition as well.