Backwell / Asbestos abatement / Asbestos removal before renovation
5.0 stars on Google

Asbestos Removal Before Renovation in Syracuse and Upstate NY

  • NYS DOL Asbestos License #591872
  • Kitchens, baths, additions and gut rehabs
  • Floors, walls and pipe in the work area

Old floor tile, sheet vinyl, mastic, wall compound, plaster, pipe wrap and siding found in the middle of a remodel. We take it out of houses, two-families and small rentals so the kitchen, bath or addition can keep moving.

ESTIMATE IN 1 HOUR!
Send the address and a few photos of the material.
Get My Price
Send it now and you will have a price within 1 hour. 7 AM to 9 PM ET.

Get My Price

Price within 1 hour.

Or call: (315) 810-9558

#591872
NYS DOL License
1 hr
Estimate
5.0★
Google Rating
14
Counties Served
The Problem

Asbestos During Renovation: What Turns Up When You Open Things

Remodeling an older house means peeling back layers, and the bottom layers are where asbestos materials sit. The kitchen floor might be new vinyl over old linoleum over nine-inch tile glued down with black mastic. The bathroom wall might be tile over plaster over a skim coat. The basement ceiling under the kitchen might hide a run of wrapped heating pipe. These products were installed from the 1920s into the late 1970s.

Contractors use their own names for what they find. Black glue, the old squares, cement board, the white stuff on the pipes, the gray paper under the siding. None of those names tell you for sure what is in the material, and plenty of old products contain no asbestos at all. Material that is already broken or crumbling should be left alone and not disturbed until it is removed.

Kitchens

Asbestos Removal for a Kitchen Remodel

The kitchen is where it turns up most. A 1950s ranch in Liverpool or Mattydale often has its original tile under two newer floors, and the cabinets sit right on top of it. A 1920s two-family on the Westside or in Strathmore can have sheet flooring, plaster walls and a radiator line in the floor. When the old cabinets come out, all of it is exposed at once.

Asbestos removal for kitchen remodel work usually means taking up the old flooring layers down to the subfloor and removing any wall or ceiling material that the new layout disturbs. The cabinets and countertops can be taken out by the remodeler first, or left for us if they are glued to the old floor. Either way, the remodeler gets an empty room and a clean subfloor.

Bathrooms

Asbestos Bathroom Remodel Work

Bathrooms are smaller but more layered. An asbestos bathroom remodel in an older Syracuse house may involve tile set in a heavy mortar bed, plaster walls behind the tub, sheet flooring under ceramic, and a cast iron drain wrapped where it passes through the basement. Capes in Westvale and Fairmount with an upstairs bath in the knee-wall space are another common case.

Because the space is small, most bathroom jobs are short. The room is sealed off, the old materials come out, and the plumber has open walls and a bare floor for the new rough-in. A powder room or a single tub surround is a normal size job for us, and it is priced the same way as a full gut, from photos and the address.

Price within 1 hour. Send the address and a few photos.
Mid-Project

Contractor Found Asbestos and the Renovation Stopped

A lot of our renovation calls start the same way. The contractor found asbestos, or thinks they did, and stopped. Sometimes it is the remodeler, sometimes the plumber, the electrician or the flooring installer. Many trades will not keep working around old tile, wrap or compound until it has been removed. The homeowner ends up with a half-open kitchen and a crew that has moved to another job.

When a renovation stopped for asbestos, the fastest path is to send us photos of what was found and the area around it, along with the address. Leave the material where it is, close the room off, and do not sweep up the debris. We send a price within 1 hour, 7 AM to 9 PM ET, and the remodeler can plan around it once the work is booked.

Bigger Projects

Asbestos Removal for Home Addition Projects and Gut Rehab Abatement

An addition touches the outside of the house. Where the new wall ties into the old one, the siding, sheathing paper and roofing at that joint have to come off, and cement siding or old shingles are common there. Inside, the wall being opened up may have plaster or compound. We remove the exterior and interior materials at the tie-in so the framer can start clean.

A gut rehab is the full version. Investors and landlords buying a two-family in Eastwood or on the Northside, or a farmhouse in Oswego or Cayuga County, often strip everything to the studs. Gut rehab abatement means the flooring, walls, ceilings, pipe wrap and sometimes the boiler come out in one job. Photos of each room and the basement are enough to price the whole house.

Getting a Price

What to Send Before the Remodel Starts

Send the address and photos of each area in the renovation plan. Put something in the frame for scale, like a door, a cabinet or a tape measure. Give us a rough size, such as room dimensions or square feet of floor, and say what the remodel will change. If an outside firm has done a lab report or survey, include it. If not, we price the materials as presumed asbestos-containing.

Getting a price before the remodel starts makes the schedule easier for everyone. The remodeler knows when the room will be ready, and the homeowner knows the cost before the old floor comes up. The phone number is (315) 810-9558 for anyone who would rather send the address that way.

On Site

What the Removal Looks Like While You Live There

The rooms in the remodel are sealed off from the rest of the house, so the family can usually keep using the bedrooms, living room and other bath. Our own DOL-certified crew takes the material out, bags it and hauls it to a permitted landfill. A single bathroom or one kitchen floor often takes hours to a day, and a gut rehab takes a few days or more.

When the crew leaves, the area is cleared down to subfloor, studs or framing, depending on what the remodel needs, and it is clean. We file the required state notices, and the homeowner receives the waste manifests for the job. Keep those with the house records for when the house is sold or refinanced later.

Who We Work For

Remodelers, Homeowners, Landlords and Buyers

Homeowners call before a kitchen or bath job, or in the middle of one. Remodelers and general contractors call to get the abatement done ahead of their crews. Plumbers and HVAC installers call when the old pipe wrap or duct tape is in the path of their work. Landlords call during a rental turnover. Buyers call after closing on a house they plan to update, and sellers call when an offer depends on it.

Small jobs are welcome. One room, one floor, one section of pipe under a new bath, or one wall where an addition ties in is a normal job. If the house is past remodeling and is coming down instead, we also do demolition, so the abatement and the teardown are one company and one schedule.

Service Area

Asbestos Removal Before Renovation in Syracuse and Upstate NY

We work out of 4830 W Seneca Turnpike, Syracuse NY 13215, and handle renovation abatement throughout Syracuse and Onondaga County, from Manlius and Fayetteville to Solvay and Baldwinsville. Remodels in Oswego, Cayuga, Cortland, Madison, Oneida, Seneca, Wayne and Jefferson counties are part of the same area, as are jobs around Rochester, Utica, Binghamton, Watertown and Elmira. Send the address and photos from anywhere in that range.

Typical Cost

What Asbestos Removal Costs in Central NY

The price depends on how many rooms and layers are involved, which materials the remodel actually disturbs, and how much of each there is. Flooring glued in several layers, plaster behind tile, and exterior siding or roofing at an addition tie-in all change the work and the price.

Typical figures for common asbestos jobs in Central NY:

JobTypical cost
Smallest jobs: one pipe run, one section of duct, one roomFrom about $1,250
Floor tile and mastic, one room$1,500 to $4,500
Pipe insulation$2,000 to $8,000
Ductwork or duct wrap$2,000 to $8,000
How It Works

How the Job Runs

01
Send the address and photos
Estimate in 1 hour, 7 AM to 9 PM ET.
02
Tested or presumed
We remove, we do not test. Send an existing lab report with your photos, or we price the material as presumed asbestos-containing.
03
Notifications filed
NYS DOL and occupant notices handled for you under Industrial Code Rule 56.
04
Removal
Our own DOL-certified crew removes the material.
05
Legal disposal
Bagged, labeled and hauled to a permitted landfill. Waste manifests to you.
06
Demo if you need it
Tearing the building down after? Same company, one schedule.
Common Questions

Asbestos Removal before Renovation Questions

Before is easier. When the materials are removed first, the remodeler can open walls and floors without stopping. If the remodel already started and something turned up, that is common too. Leave the material in place, close off the room, and send us photos with the address.
Often yes, if they come out without breaking up the floor or wall material behind them. Cabinets glued down to old tile or fastened through plaster are sometimes left for our crew. Send photos of the cabinets and the floor at the toe kick, and tell us what the remodeler plans to do.
If the new floor goes over it without cutting or grinding, many owners leave it covered. If the remodel means tearing up the subfloor, moving walls or running new plumbing through the floor, the old layers usually come out first. Tell us what the remodel involves and we price the removal to match.
Photos of the bathroom floor, the walls being opened, and the pipes in the basement below. Add a door or tape measure for scale and the address. If the plumber pointed out a specific spot, include a close shot of it. We send a price within 1 hour, 7 AM to 9 PM ET.
Yes. The siding, sheathing paper and roofing at the tie-in are a regular part of an addition job. Cement siding and older shingles are common on houses in this area. We remove them along the line where the new framing meets the house, and the framer works from there.
Yes. Send photos of every room, the basement, the attic access and the outside, along with the address and the plan. Gut rehab abatement is priced as one job covering floors, walls, ceilings, pipe wrap and any boiler. Landlords and investors often send several houses together.
Usually not for one room or one floor. The work area is sealed off and the rest of the house stays in use. For a full gut, the house is normally empty anyway. Tell us who is living there and which rooms need to stay open, and the job is planned around that.
An outside firm does that work, and the owner or the remodeler sends us the report with the photos. We remove the material. If there is no report, we price the materials as presumed asbestos-containing, which gives you a number to plan the remodel around right away.
A cleared and cleaned work area, ready for the remodeler, and the waste manifests showing the material went to a permitted landfill. We file the required state notices for the job. Many owners hand a copy of the manifests to their remodeler and keep the originals with the house papers.
By Material

Other Asbestos Materials We Remove

Get Your Price

Send the address and a few photos. Estimate within 1 hour, 7 AM to 9 PM ET.

Get My Price ☎ (315) 810-9558

Service areas