Removal of asbestos plaster, skim coat and acoustical plaster from walls and ceilings, with the lath behind it when the job calls for it. We work in Victorian houses, two-families, capes, farmhouses, churches, schools, theaters and mill buildings across Upstate New York.
Price within 1 hour.
Plaster was the wall and ceiling finish in most Central New York houses until drywall took over in the 1950s and 1960s. It went on in coats: a rough base coat over wood lath, metal lath or gypsum rock lath, then a smooth finish coat. From the 1920s into the 1970s, some plaster mixes, patching plasters and finish coats can contain asbestos. You cannot tell from the color or hardness of the wall.
A skim coat is a thin layer of plaster or joint compound troweled over an older wall or ceiling to smooth it, and older skim coats can contain asbestos even when the plaster behind them does not. Acoustical plaster is a soft, sandy or spongy plaster used on ceilings in auditoriums, churches, gyms and school corridors to cut echo. Plaster that is crumbling, bulging or falling should be left alone and not disturbed until it is removed.
Plaster runs through nearly every older house in the region. Victorian and Queen Anne houses in the Hawley-Green, Strathmore and Outer Comstock neighborhoods of Syracuse have it on wood lath. Two-families on the North Side and in Lincoln Hill have it on every wall and ceiling. Bungalows and foursquares from the 1910s and 1920s in Auburn, Oswego, Fulton and Rome carry heavy three coat plaster, and 1940s capes often have plaster on rock lath.
Farmhouses in Madison, Cayuga and Wayne counties often mix original horsehair plaster with later patches and skim coats from different decades. Commercial and public buildings carry a lot of it: churches with plastered sanctuaries, schools with acoustical plaster in auditoriums, theaters, downtown office buildings in Utica and Binghamton, and mill offices along the Oswego River. An asbestos plaster ceiling in a church or hall can be high, ornamented and large.
Plaster usually comes out as part of a bigger project. Gutting a plaster house down to the studs for new wiring, plumbing and insulation is the most common reason. Other reasons include water damage, fire damage and owners who want an open floor plan in a house built with small rooms. These are the projects that bring plaster jobs to us:
Send the address and photos of each room or wall that is coming out. Wide photos show the extent, and close photos of a broken edge, a hole or a damaged corner show the layers and the lath behind them. Hold a tape measure or a pen in the shot for scale. Point out any skim coat, texture or painted finish on top, and any ornamental plaster such as crown molding or ceiling medallions.
Give us the scope in plain terms: which rooms, walls or ceilings or both, the rough size of each room and the ceiling height. If the plan is gutting the whole floor or the whole house, say so. A lab report from the seller or the architect can come with the photos. If there is none, the plaster is priced as presumed asbestos-containing. You get a price in 1 hour, 7 AM to 9 PM ET.
Plaster jobs are bigger and heavier than most. The rooms in the scope are sealed off from the rest of the building, and we file the required state notices. Our DOL-certified crew removes the plaster and, when the scope calls for it, the lath behind it, then bags the debris and hauls it to a permitted landfill. A single wall or ceiling can be a day. A room or two often takes a few days, and a full house gut runs longer.
When the crew leaves, the rooms are down to studs and joists, or to whatever backing the scope called for, cleaned and with the enclosure removed. Electrical boxes, pipes and duct runs inside the walls stay in place unless you tell us otherwise. Trim, doors and windows that are staying are covered and protected. You receive the waste manifests for the material that left the site.
Homeowners call when they buy an older house in Syracuse, Skaneateles or Cazenovia and plan to gut it before moving in. Landlords call when a two-family needs new wiring and insulation between tenants. General contractors and renovation companies bring us in so their framers, electricians and plumbers can start on open walls. Insurance restoration companies call after a fire or a burst pipe brings a ceiling down.
Churches, schools and commercial owners use us for acoustical plaster ceilings, damaged walls and full interior strip-outs. Developers turning an old mill or downtown building into apartments need the plaster out before construction. Small jobs are welcome too: one wall, one ceiling, or a single bathroom being opened up for a new tub. The process is the same, scaled to the work.
Open walls are where the next trades want to be. Electricians rewire, plumbers run new supply and drain lines, HVAC installers add ducts and returns, and insulation goes in before new drywall closes it up. In a church or school, a new ceiling system goes up where the acoustical plaster came down. The rebuild starts from a clean, known structure.
Some buildings are past saving once the plaster is off and the framing is exposed. Backwell also does demolition, so a house or building that is coming down can be abated and demolished by one company on one schedule. That avoids handing the site from one contractor to another in between, which matters on a tight city lot or on a vacant building that has to come down.
Our office is at 4830 W Seneca Turnpike in Syracuse. We handle plaster removal throughout Onondaga County, from the city neighborhoods out to Elbridge, Jordan, Tully and Minoa. We also cover Oswego, Cayuga, Cortland, Madison, Oneida, Seneca, Wayne and Jefferson counties, and the Rochester, Utica, Binghamton, Watertown and Elmira areas. Send the address and photos of the rooms for a price within 1 hour, or call (315) 810-9558.
Plaster removal is priced by the wall and ceiling area, the number of coats and whether the lath comes out with it. Ceiling height, ornamental work, skim coats and stairwells add time, and so does carrying heavy debris down from the upper floors of a two-family or a church. A partial job inside a lived-in house also needs more setup than a full gut of an empty building.
Typical figures for common asbestos jobs in Central NY:
| Job | Typical cost |
|---|---|
| Smallest jobs: one pipe run, one section of duct, one room | From about $1,250 |
| Floor tile and mastic, one room | $1,500 to $4,500 |
| Pipe insulation | $2,000 to $8,000 |
| Ductwork or duct wrap | $2,000 to $8,000 |
Send the address and a few photos. Estimate within 1 hour, 7 AM to 9 PM ET.