Joint compound, tape seams, skim coats and sprayed wall texture on drywall from the 1950s through the 1970s. We take it out of ranches, split-levels, apartments, offices and storefronts so the remodel can go ahead.
Price within 1 hour.
Drywall is a sheet of gypsum faced with paper, and the board itself seldom contained asbestos. The problem is usually what went on top of it. The mud used to fill seams and cover screw heads, the paper tape bedded in that mud, and the sprayed or troweled textures on walls and ceilings commonly had asbestos mixed in through the 1970s. Older boxes of patching compound left in a basement can have it as well.
Most people never see the compound as a separate thing. It looks like smooth painted wall. You find it when a wall is cut open and the seam lines show as a slightly raised strip, or when old texture flakes off in a chalky white layer. Homeowners call it sheetrock mud, tape and mud, skim coat, swirl, knockdown or orange peel. Drywall tape compound around a hole can turn out to be the same material.
The houses that have it most often are the drywall-era homes of the 1950s, 1960s and 1970s. Think of the ranches and raised ranches in Mattydale and North Syracuse, the split-levels in Camillus, Fairmount and Liverpool, and the capes in Westvale that had their attics finished with drywall and a knee wall. Many of those houses still carry the original mud and texture under a few coats of paint.
Older houses can have it too. A 1920s two-family on the Westside or in Eastwood was built with plaster, but kitchens, baths and back porches were often redone with drywall decades later. Garden apartments in Baldwinsville and DeWitt, small office buildings, dentist offices and storefronts on village main streets in Fulton, Oneida and Auburn commonly have the same wall systems.
The usual reason is a gut. Somebody plans to take a kitchen or bathroom down to the studs, and the remodeler wants the walls handled first. A lot of general contractors, electricians and plumbers will not cut into drywall from those decades until the compound is removed or has a report showing what it is. The project sits until that question is answered.
Water damage is the one that cannot wait long. Wet drywall sags and crumbles, and the mud on it comes loose with it. If a ceiling has dropped or a wall has gone soft, keep people out of the room, shut off the water, and leave the damaged material where it is. Then send photos with the address, and we price the removal of the wet section.
We price walls and ceilings from photos. Take a picture of each wall or ceiling that is coming out, step back far enough to show the whole surface, and put something in the frame for scale, like a door or a tape measure against the wall. If a contractor already cut a hole, a close shot of the cut edge helps us see the layers.
If a lab report exists from an outside firm, send it with the photos. Many owners only have a report on one room or one sample of texture, and that is still useful. When there is no report, we price the compound and texture as presumed asbestos-containing, so you have a number to plan around before the next trade arrives.
Phone photos are plenty. Nobody needs to climb into a ceiling or pull trim off to get a price, and nothing should be cut open just to show us more. Send the address and the photos, and you get a price within 1 hour, 7 AM to 9 PM ET. Our phone number is (315) 810-9558.
The room or rooms being gutted are sealed off from the rest of the house, so the kitchen can be closed while the bedrooms and living room stay in use. Doorways, vents and openings to the other rooms are covered. The drywall, tape and compound are taken down, bagged and hauled to a permitted landfill. The work is done by our own DOL-certified crew.
One bathroom or a single wall can go in hours to a day. A full kitchen, a finished basement or a whole floor takes longer, and a whole-house gut can run a few days. When the crew leaves, the studs and ceiling joists are bare, the floor is clean, and the room is ready for the framer, electrician or plumber. We file the required state notices, and you get the waste manifests.
Homeowners call before a kitchen or bath gets gutted. Landlords call when a unit turns over with holes, water stains or smoke damage in the walls. Buyers and sellers call after the inspection report mentions the texture. Remodelers, electricians and plumbers call when they open a wall and stop work. Property managers and general contractors call with a unit or a floor that needs to be stripped before their crews start.
Small jobs are welcome. One wall for a new doorway, one ceiling under a leak, or the drywall around a single tub surround is the kind of thing we price every day. A landlord with several units in one building can send photos of each, and we price them together or one at a time, whichever fits the turnover plan.
With the old walls gone, the remodel moves straight into its next phase. The electrician rewires, the plumber reroutes supply and drain lines, insulation goes into exterior walls, and new drywall goes up and gets finished with modern compound. Cabinets, tile and trim follow. Nothing about the new work waits on the old material once it is removed and the paperwork is done.
If the house or an addition is coming down instead of being remodeled, we also do demolition. In that case the walls and other asbestos materials are removed first, and the building comes down by the same company on one schedule, without lining up a separate demolition contractor or waiting for one crew to finish before the next can be booked.
We are based at 4830 W Seneca Turnpike, Syracuse NY 13215, and we remove asbestos drywall and joint compound across Syracuse and Onondaga County. The service area also covers Oswego, Cayuga, Cortland, Madison, Oneida, Seneca, Wayne and Jefferson counties, along with the Rochester, Utica, Binghamton, Watertown and Elmira areas. Clay, Manlius, Skaneateles, Geneva and Rome are all regular addresses for us.
The price depends on how many square feet of wall and ceiling are coming out, how many rooms are involved, and how high the ceilings are. Wet or collapsed drywall, heavy texture, and plaster or paneling behind the board change the amount of material and the time it takes.
Typical figures for common asbestos jobs in Central NY:
| Job | Typical cost |
|---|---|
| Smallest jobs: one pipe run, one section of duct, one room | From about $1,250 |
| Floor tile and mastic, one room | $1,500 to $4,500 |
| Pipe insulation | $2,000 to $8,000 |
| Ductwork or duct wrap | $2,000 to $8,000 |
Send the address and a few photos. Estimate within 1 hour, 7 AM to 9 PM ET.